11111 Desdemona Dr
Dallas, TX 75228
11111 Desdemona Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 11111 Desdemona Dr, Dallas, TX 75228. The most recent, filed August 5, 2025, covers: “Gas test + repair - locked gas meter”.
Compiled from City of Dallas records · updated Aug 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2025
- since Aug 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 11111 Desdemona Dr
What is being built at 11111 Desdemona Dr?
The latest filing (City of Dallas permit RES-PLM-25-003266, August 5, 2025) covers gas test + repair - locked gas meter.
How many permits and filings does 11111 Desdemona Dr have?
1 filing across 1 project, from August 5, 2025 to August 5, 2025.
Is there other construction near 11111 Desdemona Dr?
Yes. Nearby filings include 11117 Desdemona Dr (install 29 gallon gas water heater in kitchen closet (swap out), Jul 30, 2025); 11103 Desdemona Dr (replace sewer line in yard, Aug 7, 2026); 11222 Castolon Dr (install water heater, Sep 29, 2020).
How do I get alerts for new permits at 11111 Desdemona Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 11117 Desdemona DrJul 30, 2025Install 29 gallon gas water heater in kitchen closet (swap out) · 6 m away
- 11103 Desdemona DrAug 7, 2026Replace sewer line in yard · 8 m away
- 11222 Castolon DrSep 29, 2020Install water heater · 89 m away
- 11016 Estacado DrAug 18, 2026Sewer replacement done under the home · 108 m away
- 11002 Estacado DrJul 13, 2026Replace riser conduit, add afci breakers, add surge protection · 110 m away
- 11128 Castolon DrMay 18, 2026Replacing a 200 amp overhead meter base, a 200 amp panel, whole home rewire, grounding and surge protection · 113 m away
- 11108 Castolon DrJun 30, 20263.5-ton condenser with 100k btus furnace changeout · 128 m away
- 11115 Castolon DrMar 19, 2026Replace meterbase, riser and service entrance conductors · 133 m away
- 10908 Estacado DrJul 7, 2025Mcr new pv system design20 modules - 7.400 kw dc, 5.800 kw ac system size · 144 m away
- 11206 Estacado DrMay 5, 2026Gas test · 160 m away
- 11212 Barbarosa DrSep 24, 2020Electrical repairs · 176 m away
- 11102 Barbarosa DrNov 4, 2026Nsfaa new construction sfd · 207 m away