11511 Ferguson Rd
Dallas, TX 75228
Electrical meter and disconnect work at 11511 Ferguson Road
City of Dallas permits at 11511 Ferguson Road indicate electrical work to replace meters and install disconnects. The first filing was dated August 4, 2025, and the latest permits, filed June 9, 2026, describe this work; the records do not identify a new building.
Summarized from City of Dallas records · updated Jun 9, 2026
- Projects
- 25
- 25 filings
- Latest filing
- Jun 9, 2026
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
25 projectsSources: City of Dallas
Questions about 11511 Ferguson Rd
What is being built at 11511 Ferguson Road?
The records do not identify a new building. Recent City of Dallas permits describe replacing electrical meters and installing disconnects.
What work was permitted at 11511 Ferguson Road?
Permits indicate electrical meter replacements and disconnect installations. For example, permits COM-ELC-26-002530 and COM-ELC-26-002529 were filed June 9, 2026.
When were permits filed for 11511 Ferguson Road?
The first filing in the records is dated August 4, 2025. The latest filing is June 9, 2026.
Is a new building planned at 11511 Ferguson Road?
The available records do not identify a new building or provide a building size. The recent permits are for commercial electrical work.
Are the permits for solar work at 11511 Ferguson Road?
The project category is listed as solar install, but the recent permit descriptions specify meter replacement and disconnect installation.
Also being built nearby
All of 75228- 11555 Ferguson RdOct 2, 2026Requesting electrical service release for existing commercial tenant space. no electrical work, alterations, or modifications are proposed. power is requested for cleaning and preparation of the existing tenant space · 68 m away
- 3851 Casa Del Sol LnSep 3, 2026Domestic water line reroute · 146 m away
- 11485 Dumbarton DrOct 22, 2025Remove old roofing system, down to the deck, inspect and replace decking as needed, replace with entire new roofing system · 176 m away
- 11468 Dumbarton DrOct 28, 2026Sewer and branch line relay under slab foundation · 184 m away
- 11474 Dumbarton DrApr 23, 2026To replace a 3 ton system · 184 m away
- 11462 Dumbarton DrJul 9, 2025Sewer relay · 184 m away
- 11515 Dumbarton DrJul 17, 2025Re-roof · 215 m away
- 11521 Dumbarton DrNov 25, 2020Replace water heater & replace/test gas service · 231 m away
- 11522 Dumbarton DrJul 9, 2025Sewer relay · 238 m away
- 11406 Dumbarton DrJul 29, 2026Replace gas line inside the house · 240 m away
- 11527 Dumbarton DrFeb 26, 2026Tunnel and reroute for bathroom and laundry. also replace 50gal gas water heater in garage · 248 m away
- 11534 Dumbarton DrAug 31, 2026Technician is going to take everything apart and put in a new union, body stop, and a 90 · 266 m away
More solar installs in 75228.