2119 Blake Ave
Dallas, TX 75228
Plumbing work permitted at 2119 Blake Ave
City of Dallas permits indicate residential plumbing work at 2119 Blake Ave, including a water heater installation, sewer pipe and trench replacements, and a water trench. The filings date from October 6, 2025, through October 14, 2026; they do not describe a new building.
Summarized from City of Dallas records · updated Oct 14, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 14, 2026
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2119 Blake Ave
What work is happening at 2119 Blake Ave?
City of Dallas records list a water heater installation, sewer pipe and trench replacements, and a 40-foot water trench. The records are residential plumbing permits.
Is a new house being built at 2119 Blake Ave?
The listed permits describe plumbing work, not construction of a new house. They include water and sewer work and a water heater installation.
When were permits filed for 2119 Blake Ave?
The earliest listed permit was filed October 6, 2025, and the latest was filed October 14, 2026.
What does permit RES-PLM-26-010952 cover?
The City of Dallas permit, filed October 14, 2026, describes a 40-foot water trench.
What sewer work was permitted at 2119 Blake Ave?
Permit RES-PLM-25-008244, filed December 2, 2025, describes replacement of a 60-foot main sewer pipe and a 50-foot sewer trench.
Was a water heater installation permitted at 2119 Blake Ave?
Yes. City of Dallas permit RES-PLM-25-005733, filed October 6, 2025, describes a water heater installation.
Also being built nearby
All of 75228- 2127 Blake AveDec 9, 2020Remove existing roof and install new roof · 6 m away
- 2109 Blake AveAug 6, 2026Drain repair under home · 7 m away
- 2114 Blake AveJul 28, 2025Move electrical meter from below eve to mast above roof · 13 m away
- 2108 Blake AveNov 10, 2025Gas test + repairs locked gas repair · 15 m away
- 2104 Blake AveJan 19, 2021Install new hvac · 16 m away
- 10105 Newcombe DrMar 10, 2026Hvac replacement · 29 m away
- 2114 Highwood DrJan 30, 2026Water heater install · 88 m away
- 2122 Highwood DrJul 23, 20263 ton base coil/ condenser upflow · 90 m away
- 2134 Highwood DrApr 1, 2026Replace existing hvac equipment · 96 m away
- 10129 Newcombe DrNov 3, 2025Remodel two bathrooms, replace two showers and one bathtub, move 3 hand sinks · 104 m away
- 2024 Blake AveNov 18, 2026Upgrade service to a 200 amp meter with 200 amp panel and new breakers · 125 m away
- 10030 Newcombe DrJun 4, 2026Install new hvac system with some duct work · 127 m away