2134 Monterrey Ave

Dallas, TX 75228

Dallas home permitted for fire-damage repairs and system work

City of Dallas permits indicate residential repair and system work at 2134 Monterrey Ave, rather than a new home. A July 21, 2025 alteration permit cites fire damage with no structural changes; later permits cover electrical work, a 3.5-ton air-conditioning system and a gas test, filed through January 20, 2026.

Summarized from City of Dallas records · updated Jan 20, 2026

Projects
4
4 filings
Latest filing
Jan 20, 2026
since Jul 21, 2025
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Gas test

    Gas test

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-000761
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installing 3.5 ton a/c system complete

    Installing 3.5 ton a/c system complete

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-001588
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electric wire

    Electric wire

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-001610
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Nsfaa-fire damage no structural changes

    Nsfaa-fire damage no structural changes

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-25-000146
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2134 Monterrey Ave

What is being built at 2134 Monterrey Ave?

The records indicate work on an existing home, not a new building. A July 21, 2025 alteration permit cites fire damage with no structural changes, followed by electrical, air-conditioning and gas-test permits.

Was a new house permitted at 2134 Monterrey Ave?

The records provided do not show a new-home permit. They show an alteration permit for fire damage with no structural changes, plus permits for home systems.

When were permits filed for 2134 Monterrey Ave?

The earliest listed permit was filed July 21, 2025, and the latest was filed January 20, 2026. The latest record, RES-PLM-26-000761, is for a gas test.

What repairs are planned at 2134 Monterrey Ave?

The permits list an alteration for fire damage with no structural changes, electrical wiring, installation of a 3.5-ton air-conditioning system and a gas test. The records do not provide a broader scope of repairs.

Was fire damage reported at 2134 Monterrey Ave?

Yes. The City of Dallas alteration permit RES-ALT-ADD-25-000146, filed July 21, 2025, describes fire damage and says there are no structural changes.

What does the latest permit for 2134 Monterrey Ave cover?

The latest listed permit is RES-PLM-26-000761, filed January 20, 2026, for a gas test.