2311 Homeway Cir
Dallas, TX 75228
Permits cover foundation and gas-leak repairs
City of Dallas permits at 2311 Homeway Cir cover residential foundation repairs and a gas-leak repair. The foundation permit was filed Nov. 13, 2025, and the gas-leak permit was filed Oct. 1, 2026.
Summarized from City of Dallas records · updated Oct 1, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 1, 2026
- since Nov 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2311 Homeway Cir
What is being built at 2311 Homeway Cir?
The City of Dallas records show residential repairs, not a new building: foundation work and a gas-leak repair.
What repairs are permitted at 2311 Homeway Cir?
The records list installation of 13 foundation piers and shimming across 1,524 square feet, plus a gas-leak repair with a pressure test.
When was the foundation repair permit filed at 2311 Homeway Cir?
The foundation repair permit, RES-FDN-25-000602, was filed Nov. 13, 2025.
When was the gas-leak repair permitted at 2311 Homeway Cir?
The residential plumbing permit, RES-PLM-26-010503, was filed Oct. 1, 2026, for a gas-leak repair with a pressure test.
Is a new home being built at 2311 Homeway Cir in Dallas?
The records provided list permits for foundation and gas-leak repairs, not construction of a new home.
Also being built nearby
All of 75228- 2315 Homeway CirJan 20, 2026Gas pressure test · 15 m away
- 2341 Babalos LnJun 18, 2025Install 200 amp overhead main electric service, install weatherproof first responders disconnect, install 200 amp main breaker panel in garage, install grounding system, install whole home ultra surge protector, install battery powered smoke detectors in bedrooms and hallway · 123 m away
- 2337 Babalos LnJan 1, 2026Electrical panel replacement · 130 m away
- 2328 Babalos LnJun 5, 20264-ton condenser change-out in backyard & 88k btu furnace change-out in attic · 148 m away
- 2329 Freeland WayNov 4, 2025Replace 3.0 ton furnace with a 3.0 ton furnace · 188 m away
- 2322 Freeland WayAug 26, 2026Sewer line repair · 205 m away
- 2305 Freeland WayNov 4, 2025Replace existing hvac system · 223 m away
- 2407 Park Vista DrDec 10, 202532 concrete piers will be installed · 244 m away
- 2235 Homeway CirSep 20, 2026Replace electrical riser · 260 m away
- 3222 Guiding Light DrNov 5, 2025Plumbing remodel. will need inspector to come out and inspect shower pan and rough in in the wall · 269 m away
- 2357 Light Shore DrOct 23, 20262357 light shore install 13 concrete pilings to stabilize foundation · 280 m away
- 2227 Homeway CirJul 8, 2026Gas ; install gas 30 foot gas line for new stove · 289 m away