2359 Highland Rd
Dallas, TX 75228
2-inch double check replacement permitted at 2359 Highland Rd
A City of Dallas commercial plumbing permit indicates replacement of the 2-inch double check at the meter at 2359 Highland Rd. The permit was filed June 1, 2026, under permit COM-PLM-26-001969.
Summarized from City of Dallas records · updated Jun 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2026
- since Jun 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2359 Highland Rd
What work is planned at 2359 Highland Rd in Dallas?
A City of Dallas commercial plumbing permit describes replacing the 2-inch double check at the meter. It does not describe construction of a new building.
When was the plumbing permit filed for 2359 Highland Rd?
The permit was filed June 1, 2026. Its number is COM-PLM-26-001969.
What is permit COM-PLM-26-001969 for?
The permit is for replacement of the 2-inch double check at the meter at 2359 Highland Rd.
Is a new business or tenant opening at 2359 Highland Rd?
The available permit record describes plumbing work only and does not identify a business or tenant.
How much will the work at 2359 Highland Rd cost?
The permit record does not report a valuation for the work.
Also being built nearby
All of 75228- 2364 Highland RdApr 5, 2026Gas test · 23 m away
- 2375 Highland RdJul 30, 2026Replaced 80 feet of gas line in backyard. work was done from gas meter to back wall of the house. 1 1/4'' gas line was used to make connection with tracer wire and risers · 51 m away
- 8024 Ferguson RdSep 10, 2026Clean and show permit to establish electricity in a vacant space · 75 m away
- 2318 Highland RdSep 23, 2020Replace or modify existing hvac · 127 m away
- 2376 Longhorn StFeb 4, 20262 hvac instalattion:3 ton2.5 ton · 134 m away
- 2338 Longhorn StAug 27, 20252338 longhorn reset reshim 947sqft to stabilize foundation · 138 m away
- 8040 Ferguson Rd · Brixmor Property GroupNov 15, 2025Performed backflow testing on two backflow prevention devices inside th building · 142 m away
- 2402 Highland RdJan 20, 2026Retaining wall construction around perimeter of property to raise site for construction · 144 m away
- 2404 Highland Rd · Ahmad Farahani - Iconick Homes LLCJan 2, 2025Birds nest circle — new construction — construction of 4 new townhome buildings with 10 total units. project includes utility and paving infrastructure · 148 m away
- 7918 Ferguson RdOct 23, 20253" rpz on main line back room · 166 m away
- 2305 Highland RdJul 1, 2025Electrical service for city street lights · 171 m away
- 2461 Wildoak CirOct 14, 2025Upgrade panel · 183 m away