2666 Peavy Rd
Dallas, TX 75228
Electrical service and water heater work at 2666 Peavy Rd
Dallas permits indicate residential electrical and plumbing work at 2666 Peavy Rd, not a new building. The plumbing permit, filed April 1, 2026, covers a water-heater shutoff valve; the electrical permit, filed April 27, 2026, covers replacement of a 200-amp electrical service.
Summarized from City of Dallas records · updated Apr 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 27, 2026
- since Apr 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2666 Peavy Rd
What is being built at 2666 Peavy Rd?
The permits describe residential electrical and plumbing work, not a new building. They cover replacement of a 200-amp electrical service and work on a water-heater shutoff valve.
What work was permitted at 2666 Peavy Rd in Dallas?
A plumbing permit filed April 1, 2026, describes a 40-gallon gas water heater shutoff valve. An electrical permit filed April 27, 2026, describes replacement of a 200-amp standard electrical service.
Is a new home being built at 2666 Peavy Rd?
The available Dallas permit records do not describe new home construction. They list electrical service replacement and water-heater valve work.
What does permit RES-ELC-26-002384 cover?
The Dallas residential electrical permit, filed April 27, 2026, describes complete replacement of a 200-amp standard electrical service.
What does permit RES-PLM-26-003467 cover?
The Dallas residential plumbing permit, filed April 1, 2026, describes work on a 40-gallon gas water heater shutoff valve.
What is happening near Dallas Independent School District on Inadale Avenue?
At 2666 Peavy Rd, about 164 meters from the listed Dallas Independent School District address, permits describe residential electrical service replacement and water-heater valve work.
Also being built nearby
All of 75228- 2671 Peavy RdFeb 26, 2026Install 8ft new fence · 39 m away
- 9715 Ferguson RdJan 28, 2026Replace existing furnace · 41 m away
- 9712 Ferguson RdJan 28, 2021Install electrical for new contruction or addition · 63 m away
- 1811 Swan DrSep 12, 2025Gas test with repair. need to restore service · 94 m away
- 1724 Mapleton DrOct 21, 2020Interior exterior remodel to sfd · 101 m away
- 1848 Swan DrJan 11, 2021Remove existing roof and install new roof · 112 m away
- 1725 Mapleton DrJul 31, 20264 ton base upflow gas system · 114 m away
- 1716 Mapleton DrJan 16, 202610' sewer tunnel & water heater installation · 118 m away
- 1857 Swan DrOct 28, 2025Add 3 lights, relocate switches and outlets in bathroom remodeling · 131 m away
- 1741 Mapleton DrOct 30, 2025Replacing old with new 7’ tall cedar fence, metal posts, 2 pedestrian gates · 134 m away
- 1745 Mapleton DrSep 15, 2025Gas leak repair on yard line · 143 m away
- 1810 Inadale Avenue · Dallas Independent School DistrictMay 28, 2025George w. truett elementary school — renovation/alteration — 130,912 sq ft total space, fire alarm replacement, security infrastructure, creating secure vestibule, roof replacement on older section of building, roof deck replacement where needed, new mechanical equipment above new roof · 164 m away