2723 Larry Dr
Dallas, TX 75228
2723 Larry Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 2723 Larry Dr, Dallas, TX 75228. The most recent, filed May 27, 2025, covers: “Gas was turned off, and need a meter release”.
Compiled from City of Dallas records · updated May 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2025
- since May 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2723 Larry Dr
What is being built at 2723 Larry Dr?
The latest filing (City of Dallas permit RES-PLM-25-000738, May 27, 2025) covers gas was turned off, and need a meter release.
How many permits and filings does 2723 Larry Dr have?
1 filing across 1 project, from May 27, 2025 to May 27, 2025.
Is there other construction near 2723 Larry Dr?
Yes. Nearby filings include 2719 Larry Dr (mcr with battery flora williams- installation of a grid tied, roof mounted, solar pv system, Nov 3, 2026); 2714 Larry Dr (homeowner had gas leak on valve, replaced and retested. need inspection, Oct 16, 2026); 2712 Healey Dr (meter repair, Dec 31, 2020).
How do I get alerts for new permits at 2723 Larry Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2719 Larry DrNov 3, 2026Mcr with battery flora williams- installation of a grid tied, roof mounted, solar pv system · 5 m away
- 2714 Larry DrOct 16, 2026Homeowner had gas leak on valve, replaced and retested. need inspection · 16 m away
- 2712 Healey DrDec 31, 2020Meter repair · 87 m away
- 2807 Larry DrSep 6, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 100 m away
- 2816 Larry DrNov 10, 2025Repairing gas leak and meter release · 112 m away
- 2806 Province LnJul 31, 2025Gas test no work need per atomos energy · 167 m away
- 2646 Larry DrMay 28, 2025Change ducts · 172 m away
- 2658 Healey DrMar 23, 2026Nsfaa-adding a storage in the back of the house · 176 m away
- 2647 Province LnMay 12, 2026Gas test · 187 m away
- 2837 Province LnSep 8, 2025Foundation repair-install 6 steel piers under the home to stabilize the foundation · 193 m away
- 2709 Hillglenn RdOct 23, 2020Replace or modify existing hvac · 195 m away
- 2648 Healey DrApr 6, 2026Roof replacement shingles only · 201 m away