2807 Marbella Ln
Dallas, TX 75228
2807 Marbella Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 2807 Marbella Ln, Dallas, TX 75228. The most recent, filed June 9, 2025, covers: “Electrical service repairs/ upgrade”.
Compiled from City of Dallas records · updated Jun 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 9, 2025
- since Jun 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2807 Marbella Ln
What is being built at 2807 Marbella Ln?
The latest filing (City of Dallas permit RES-ELC-25-000593, June 9, 2025) covers electrical service repairs/ upgrade.
How many permits and filings does 2807 Marbella Ln have?
1 filing across 1 project, from June 9, 2025 to June 9, 2025.
Is there other construction near 2807 Marbella Ln?
Yes. Nearby filings include 2810 Marbella Ln (40 gallon gas water heater, Jun 16, 2025); 2821 Marbella Ln (re roof only, no redeck. tear off 1 layer, install 25 yr 3 tab shingles, Nov 3, 2025); 2827 Marbella Ln (at garage addition:rough-in of power and lighting, walls and ceilings.trim-out of power and lighting.existing circuits to be reused with gfci protection, Apr 20, 2026).
How do I get alerts for new permits at 2807 Marbella Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2810 Marbella LnJun 16, 202540 gallon gas water heater · 14 m away
- 2821 Marbella LnNov 3, 2025Re roof only, no redeck. tear off 1 layer, install 25 yr 3 tab shingles · 17 m away
- 2827 Marbella LnApr 20, 2026At garage addition:rough-in of power and lighting, walls and ceilings.trim-out of power and lighting.existing circuits to be reused with gfci protection · 25 m away
- 2806 Province LnJul 31, 2025Gas test no work need per atomos energy · 88 m away
- 2837 Province LnSep 8, 2025Foundation repair-install 6 steel piers under the home to stabilize the foundation · 116 m away
- 2820 Oates DrOct 1, 2025We are performing a gas test so that atmos will turn the gas back on · 124 m away
- 9812 Shiloh RdSep 8, 2026New traffic signals new electrical services · 144 m away
- 2723 Oates DrJun 13, 2025Install new overhead service · 144 m away
- 2704 Oates DrMay 22, 2025Gas test · 177 m away
- 2816 Larry DrNov 10, 2025Repairing gas leak and meter release · 186 m away
- 2807 Larry DrSep 6, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 198 m away
- 2815 Maverick AveMar 16, 2026Panel replacement · 206 m away