3124 Hillglenn Rd
Dallas, TX 75228
Sewer main repair and gas test at 3124 Hillglenn Rd
City of Dallas records show residential plumbing work at 3124 Hillglenn Rd: a sewer main repair permitted on February 24, 2026, followed by a gas test permitted on June 2, 2026. The sewer permit describes replacing 15 feet of broken piping beneath the property.
Summarized from City of Dallas records · updated Jun 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 2, 2026
- since Feb 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3124 Hillglenn Rd
What work is being done at 3124 Hillglenn Rd?
City of Dallas records list a sewer main piping replacement and a gas test. Both are residential plumbing permits.
Is a sewer line being repaired at 3124 Hillglenn Rd?
Yes. Permit RES-PLM-26-002069, dated February 24, 2026, describes replacing 15 feet of broken sewer main piping under the property.
Was a gas test permitted at 3124 Hillglenn Rd?
Yes. The City of Dallas issued residential plumbing permit RES-PLM-26-005664 on June 2, 2026, for a gas test.
When were permits filed for 3124 Hillglenn Rd?
The records show permits dated February 24, 2026, for sewer piping replacement and June 2, 2026, for a gas test.
Is a new home being built at 3124 Hillglenn Rd?
The two records provided are residential plumbing permits for sewer piping replacement and a gas test; they do not describe construction of a new home.
Also being built nearby
All of 75228- 3147 Hillglenn RdApr 14, 2026Repai existing driveway approach and sidewalk, exactly the same no changes getting done · 50 m away
- 3222 Millmar DrSep 1, 2026Gas test + repairs - gas meter locked · 99 m away
- 3209 Millmar DrApr 15, 2026No work · 117 m away
- 3144 Healey DrJul 30, 2025Gas test with repair · 133 m away
- 3150 Healey DrOct 12, 2026Gas test · 137 m away
- 3126 Millmar DrJul 2, 2025Mcrbat new pv+battery system design7 modules - 2.590 kw dc, 2.030 kw ac system size, battery system size : 14.300 kwh · 172 m away
- 3121 Millmar DrSep 2, 2025Gas meter release · 187 m away
- 3005 Hillglenn RdMay 20, 2026Battery 01 tesla: powerwall 3 1707000-xx-y 11.5 kw/13.5kwh [240v] 01 tesla gateway 3 · 194 m away
- 3107 Millmar DrDec 8, 2020Remodel existing plumbing · 194 m away
- 3103 Millmar DrOct 28, 2026Home renovation · 196 m away
- 9856 San Lea DrJul 9, 2025Install 15 intellijacks under the home to stabilize the foundation · 211 m away
- 3322 Modlin StNov 5, 2025Gas test · 214 m away