3124 Santa Teresa Ave
Dallas, TX 75228
Foundation repairs permitted at 3124 Santa Teresa Ave
Two City of Dallas permits filed September 2 and 3, 2025, indicate pier-and-beam foundation repairs at 3124 Santa Teresa Ave. Both records describe adjusting five existing pilings.
Summarized from City of Dallas records · updated Sep 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3124 Santa Teresa Ave
What is being built at 3124 Santa Teresa Ave?
The permits indicate residential foundation repairs, not a new building. The work is described as pier-and-beam repair and adjustment of five existing pilings.
When were foundation repairs permitted at 3124 Santa Teresa Ave?
City of Dallas permits were filed September 2 and 3, 2025.
What foundation work is planned at 3124 Santa Teresa Ave?
The permit descriptions specify pier-and-beam repair and adjusting five existing pilings.
How many permits were filed for 3124 Santa Teresa Ave?
Two City of Dallas residential foundation repair permits are listed: RES-FDN-25-000416, filed September 2, 2025, and RES-FDN-25-000418, filed September 3, 2025.
Is a new home being built at 3124 Santa Teresa Ave?
The records provided show residential foundation repair permits, not a permit for new home construction.
Also being built nearby
All of 75228- 3116 Santa Teresa AveJul 8, 20263 ton base upflow gas system · 14 m away
- 3106 Santa Teresa AveMay 26, 2026Replacing 50 gallon gas water heater · 32 m away
- 3125 Crest Ridge DrSep 15, 2020Remove existing roof and install new roof · 90 m away
- 3122 San Marcus AveMay 29, 2026Replacing 40 gallon gas water heater · 101 m away
- 3115 San Marcus AveNov 5, 2020Install city walk only · 112 m away
- 3119 San Marcus AveSep 28, 2026Pier and beam whole home water re pipe, 2 bathrooms, kitchen, laundry, water heater located in attic.with shower install pan also. 140ft total · 112 m away
- 2923 Materhorn DrAug 13, 2026The approach will be approximately 16 ft. × 11 ft. with 3/8-inch rebar spaced at 12 inches on center. the driveway will be approximately 33 ft. × 16 ft. with a concrete thickness of 4 inches and 3/8-inch rebar spaced at 18 inches on center. redwood approach dowels will be installed as required. concrete will be 3,000 psi · 134 m away
- 3211 Santa Teresa AveOct 29, 2025Per fixture 11 drop · 136 m away
- 3212 Santa Teresa AveDec 5, 2025Replacing existing main panel with new 200 amp main panel exterior · 138 m away
- 3032 Crest Ridge DrAug 4, 2026Service riser repair · 147 m away
- 3010 San Marcus AveSep 30, 2025Replaced coupling on gas pipe in crawl space · 148 m away
- 3018 Crest Ridge DrApr 1, 2026Replacing storm damaged fence on both sides of the property and going up to 8 feet with the new fence. replacing 140 linear feet of fence with one gate on the left front side of the house when you're facing the street · 161 m away