5909 Canterview Dr
Dallas, TX 75228
Two permits list garage gas water-heater replacement
City of Dallas permits list replacement of a gas water heater in the garage at 5909 Canterview Dr. The two residential plumbing permits were filed April 13 and April 17, 2026.
Summarized from City of Dallas records · updated Apr 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 17, 2026
- since Apr 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5909 Canterview Dr
What work is planned at 5909 Canterview Dr?
City of Dallas permit records describe replacing the gas water heater in the garage.
When were permits filed for 5909 Canterview Dr?
The City of Dallas records show residential plumbing permit RES-PLM-26-003857 filed April 13, 2026, and permit RES-PLM-26-004083 filed April 17, 2026.
Is a new home being built at 5909 Canterview Dr?
The records provided list two residential plumbing permits for replacing a garage gas water heater, not a new-home construction permit.
Are there two gas water-heater permits for this address?
Yes. Both City of Dallas permits describe replacing the gas water heater in the garage: RES-PLM-26-003857 and RES-PLM-26-004083.
How much will the work at 5909 Canterview Dr cost?
The permit records provided do not report a project cost or valuation.
Also being built nearby
All of 75228- 5915 Canterview DrNov 4, 2025Install approx. 130 lineat feet of fence, 115 of which is replacement and the remainder new. galvanized steel posts, cedar pickets, mix of 6ft and 8ft tall. also install one automated sliding driveway gate (approx 24 linear feet) · 8 m away
- 5919 Canterview DrJun 2, 2026Replacing a 125 amp meter base and riser, a 125 amp main disconnect, grounding and surge protection · 14 m away
- 5923 Canterview DrJan 30, 2026Gas pressure test · 19 m away
- 6010 N Jim Miller RdApr 7, 2026Replace yard service, sewer service and water yard service · 99 m away
- 5828 Canterview CirDec 2, 2020Replace or modify existing hvac · 109 m away
- 5829 Canterview DrMar 31, 2026Replacing 5 ton gas complete system · 109 m away
- 5921 N Jim Miller RdMar 1, 2026Nsfaa metal carport · 116 m away
- 8318 Londonderry LnJan 12, 2026Install new 200amp panel, meter, disconnect, ground rods, intersystem bonding, whole home surge protector · 175 m away
- 6118 N Jim Miller RdJul 23, 2026Replace gas service line in yard from meter to home · 189 m away
- 8325 Londonderry LnJun 11, 2026Re-roof; no re-deck · 190 m away
- 8324 Londonderry LnNov 13, 2025Re-roof · 191 m away
- 5836 N Jim Miller RdOct 15, 2026Relay gas service · 192 m away