8075 Fall River Dr
Dallas, TX 75228
Gas system repiping permitted at 8075 Fall River Dr
A City of Dallas permit covers repiping the home's gas system and excavating to replace the gas line from the meter to the home. The residential plumbing permit was filed November 12, 2026.
Summarized from City of Dallas records · updated Nov 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 12, 2026
- since Nov 12, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8075 Fall River Dr
What work is planned at 8075 Fall River Dr?
The permit describes repiping the home's entire gas system and excavating to replace the gas line between the meter and the home. It was filed November 12, 2026.
Is a new home being built at 8075 Fall River Dr?
The record is for plumbing work at a home, not a new-home construction project. It covers the gas system and the gas line in the yard.
When was the gas work at 8075 Fall River Dr permitted?
The City of Dallas filed residential plumbing permit RES-PLM-26-012266 on November 12, 2026.
Does the permit include replacing the gas line from the meter?
Yes. The permit description says the line from the meter to the home will be excavated and replaced.
What is permit RES-PLM-26-012266 for?
It is a City of Dallas residential plumbing permit for repiping the home's gas system and replacing the gas line from the meter to the home. The filing date is November 12, 2026.
Also being built nearby
All of 75228- 8066 Fall River DrJul 30, 2025Replacing 40 gallon gas water heater · 31 m away
- 8056 Fall River DrSep 21, 2026Replace gas service · 64 m away
- 8050 Fall River DrNov 2, 2026Forty foot horizontal sewer replacement under home · 85 m away
- 8135 Hunnicut RdMar 17, 202615’ sewer tunnel 20’ sewer trench · 102 m away
- 8108 Woodhue RdJul 30, 2025Gas test · 108 m away
- 8115 Hunnicut RdDec 3, 2025Gas meter relocate · 112 m away
- 8118 Woodhue RdDec 22, 2020Remove existing roof and install new roof · 119 m away
- 8041 Fall River DrAug 6, 2025Replace existing electrical panel with 200 amp outdoor panel with two rods, water bond, surge, afci, intersystem bond etc · 119 m away
- 8125 Woodhue RdFeb 4, 2026Double cleanouts expansion tank 40'-50' repipe from kitchen to laundry drain to main · 122 m away
- 8036 Fall River DrJul 27, 20264 ton gas system · 134 m away
- 8035 Woodhue RdJun 24, 2026Stand alone for sewer replacement · 154 m away
- 8031 Fall River DrOct 22, 2026Install gas water heater in closet · 154 m away