8705 Stanwood Dr
Dallas, TX 75228
8705 Stanwood Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 8705 Stanwood Dr, Dallas, TX 75228. The most recent, filed December 7, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Dec 7, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 7, 2020
- since Dec 7, 2020
- Largest scope
- —
- Listed value
- $4K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 8705 Stanwood Dr
What is being built at 8705 Stanwood Dr?
The latest filing (City of Dallas permit 2012073083, December 7, 2020) covers install water heater.
How many permits and filings does 8705 Stanwood Dr have?
1 filing across 1 project, from December 7, 2020 to December 7, 2020.
How much is the construction at 8705 Stanwood Dr worth?
Permits at this address list about $4K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 8705 Stanwood Dr?
Yes. Nearby filings include 8709 Stanwood Dr (replaceing main sewer line from cleanouts to city tap, Dec 11, 2025); 2228 Springhill Dr (replace 5 ton system complete. furnace, coil, condenser, Jun 4, 2025); 2244 Springhill Dr (pier and beam- replace horizontal sewer under house, Jul 29, 2025).
How do I get alerts for new permits at 8705 Stanwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 8709 Stanwood DrDec 11, 2025Replaceing main sewer line from cleanouts to city tap · 5 m away
- 2228 Springhill DrJun 4, 2025Replace 5 ton system complete. furnace, coil, condenser · 25 m away
- 2244 Springhill DrJul 29, 2025Pier and beam- replace horizontal sewer under house · 42 m away
- 2208 Springhill DrOct 27, 2026Residential re-roof of an existing single-family dwelling at 2208 springhill dr, dallas, tx 75228, work consisted of a complete tear-off of the existing roof covering down to the roof deck and replacement with 30-year architectural asphalt shingles over approximately 23 squares. the existing roof sheathing was sound and was retained; no decking replacement was required. new underlayment ,was installed. no structural changes were made to the roof framing, and there was no change to roof pitch, footprint, or building area. the work is complete and is ready for final inspection · 85 m away
- 8619 Westglen DrJun 6, 2026Construct new 8'-6" tall cedar fence with steel poles and solar powered sliding gate across the driveway · 116 m away
- 2104 Ash Grove WayJun 2, 2026Single hvac system change out · 120 m away
- 2261 Springhill DrJan 21, 2026Gas pressure test · 127 m away
- 2274 Springhill DrSep 28, 20261-in gas pipe leak repair in attic · 130 m away
- 8819 Stanwood DrOct 1, 2025New gas service from meter to house · 136 m away
- 8823 Stanwood DrOct 21, 2026Install inground awimming pool and spa · 141 m away
- 2277 Springhill DrJun 20, 2025Updating existing electrical service · 157 m away
- 2112 Ash Grove WayJun 17, 2026Replace 3.5 ton complete · 160 m away