9943 Bethany Dr
Dallas, TX 75228
9943 Bethany Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 9943 Bethany Dr, Dallas, TX 75228. The most recent, filed August 13, 2025, covers: “Replace sewer yard line from cleanout to tap”.
Compiled from City of Dallas records · updated Aug 13, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 13, 2025
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9943 Bethany Dr
What is being built at 9943 Bethany Dr?
The latest filing (City of Dallas permit RES-PLM-25-003672, August 13, 2025) covers replace sewer yard line from cleanout to tap.
How many permits and filings does 9943 Bethany Dr have?
2 filings across 2 projects, from August 13, 2025 to August 13, 2025.
What is being built near Dallas ISD in Dallas?
9943 Bethany Dr is about 91 m from Dallas ISD (2101 Millmar Drive). Its latest filing is for replace sewer yard line from cleanout to tap.
Is there other construction near 9943 Bethany Dr?
Yes. Nearby filings include 2021 Clarksdale Dr (replace yard gas line, Sep 17, 2026); 2103 Autumn Sage Pl (construction an 8 foot tall wooden cedar fence with metal posts in the areas indicated on the site drawing, Oct 16, 2025); 2101 Millmar Drive (culinary renovation, Nov 19, 2026).
How do I get alerts for new permits at 9943 Bethany Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2021 Clarksdale DrSep 17, 2026Replace yard gas line · 66 m away
- 2103 Autumn Sage PlOct 16, 2025Construction an 8 foot tall wooden cedar fence with metal posts in the areas indicated on the site drawing · 81 m away
- 2101 Millmar Drive · Dallas ISDNov 19, 2026Culinary renovation · 91 m away
- 2260 Peavy CirDec 10, 2025Water heater install · 130 m away
- 2234 Peavy CirSep 21, 2026Gas final/ we will be running a 10 foot poly service. with roughly 25 foot of black pipe replacement under pier and beam, and porch area. four drops in total on the system, water heater, furnace cooktop fireplace · 150 m away
- 2016 Province LnOct 14, 2026Install 40 gallon gas water heater (swap out) · 165 m away
- 2020 Province LnJun 26, 20263 ton rheem 1 stage upflow gas system · 174 m away
- 2116 Peavy RdApr 21, 2026Installing a new electrical pedestal to provide power to traffic signals · 176 m away
- 2112 Clarksdale DrMay 21, 2025Sewer and drain repipe · 193 m away
- 1921 Province LnApr 22, 2026Water heater · 198 m away
- 1905 Province LnAug 29, 2025Nsfaa-1. updating the kitchen (new cabinets and countertop), no plumbing work nor electrical 2. updating the bathrooms (new tile, vanity, toilet, faucets) not moving the existing plumbing nor electricity. 3. sanding and staining the hardwood floor 4. painting the house 5. changing the windows and front door · 211 m away
- 2076 Province LnOct 26, 2020Replace water heater & replace/test gas service · 216 m away