10066 Coppedge Ln
Dallas, TX 75229
Single-family home permitted after 2020 demolition
A new single-family dwelling was permitted at 10066 Coppedge Ln on Jan. 20, 2021, after a single-family-home demolition permit dated Aug. 19, 2020. A plumbing permit filed Apr. 24, 2026, covers installing a 1½-inch pressure-reducing valve in the front yard.
Summarized from City of Dallas records · updated Apr 24, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 24, 2026
- since Jan 20, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 10066 Coppedge Ln
What is being built at 10066 Coppedge Ln?
A City of Dallas permit dated Jan. 20, 2021, describes construction of a new single-family dwelling. A demolition permit for a single-family home at the address was filed Aug. 19, 2020.
When was the new home at 10066 Coppedge Ln permitted?
The new single-family construction permit, 2010136010, was filed Jan. 20, 2021.
Was a home demolished at 10066 Coppedge Ln?
Yes. City of Dallas demolition permit 2008191043, filed Aug. 19, 2020, describes demolition of a single-family home.
What is the latest permit for 10066 Coppedge Ln?
Permit RES-PLM-26-004340 was filed Apr. 24, 2026. It covers installing a 1½-inch pressure-reducing valve in the front yard after the irrigation double check.
Is 10066 Coppedge Ln a commercial project?
The available City of Dallas permit records describe a single-family-home demolition and new single-family construction, followed by a plumbing permit.
What is being built near Northway Church in Dallas 75229?
At 10066 Coppedge Ln, about 226 meters from Northway Church, City of Dallas records show a new single-family dwelling permitted Jan. 20, 2021.
Also being built nearby
All of 75229- 3858 Beutel CtOct 20, 2020Upgrade existing electrical service · 60 m away
- 10103 Crestover CirDec 30, 2025Install 3 total pilings · 109 m away
- 10110 Crestover CirAug 6, 2025Replace 50 gal gas wh, spot repair hot line under home, install doublecheck · 123 m away
- 10119 Crestover CirJan 28, 2021Interior/exterior remodel · 129 m away
- 3843 Martha LnSep 28, 2026Nsfaa 3843 martha ln · 134 m away
- 3837 Martha LnNov 18, 2020Gas test · 141 m away
- 3832 Martha LnJan 26, 2021New construction · 147 m away
- 3826 Martha LnDec 22, 2020Install lawn sprinkler · 159 m away
- 3815 Martha LnJul 28, 2026Install 5t trane hvac system · 163 m away
- 10025 Coppedge LnMay 12, 2026Replacing the main electric panel and adding an emergency disconnect · 164 m away
- 10128 Coppedge LnSep 29, 2025Install full hvac system with ductwork · 182 m away
- 3802 Martha LnSep 30, 2025Replacing 4 ton condenser and coil · 186 m away