groundranger
Recent · latest filing Dec 2025Residential

10232 Waller Dr

Dallas, TX 75229

Hardwired EV charger permitted at 10232 Waller Dr

City of Dallas records indicate a hardwired EV charger was permitted next to the electrical panel at this residence on December 2, 2025. The permit is RES-ELC-25-004859. Earlier records show an interior remodel in 2019 and relocation of 16 sprinkler heads in 2020.

Summarized from City of Dallas records · updated Dec 2, 2025

Projects
3
3 filings
Latest filing
Dec 2, 2025
since Dec 2, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Hardwire ev charger next to panel

    Hardwire ev charger next to panel

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-004859
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Relocate 16 sprinkler heads

    Relocate 16 sprinkler heads

    City of Dallas permitFire Sprinkler (Minor Work) (FS) Single Family Alteration$1
    Record
    2001281180
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Single Family Renovation
    Record
    1908131066
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 10232 Waller Dr

What is being built at 10232 Waller Dr in Dallas?

A City of Dallas permit indicates installation of a hardwired EV charger next to the electrical panel. The record does not specify whether the work is complete.

When was the EV charger permitted at 10232 Waller Dr?

The City of Dallas issued the permit record on December 2, 2025.

What is the permit number for the EV charger at 10232 Waller Dr?

The residential electrical permit number is RES-ELC-25-004859.

Is 10232 Waller Dr a residential project?

The permit is categorized as a residential electrical permit, and the address record is identified as residential.

What other work has been permitted at 10232 Waller Dr?

City records list an interior remodel in August 2019 and relocation of 16 sprinkler heads in January 2020, in addition to the 2025 EV charger permit.

Also being built nearby

All of 75229
Get alerts for 10232 Waller Dr