10235 Gooding Dr
Dallas, TX 75229
Natural-gas generator and battery backup planned at Dallas home
A City of Dallas electrical permit filed Feb. 17, 2026, covers installing a natural-gas-fed generator and a 20 kWh battery backup at this residence. A Jan. 23, 2026 plumbing permit also lists a gas test and backup generator.
Summarized from City of Dallas records · updated Feb 17, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Feb 17, 2026
- since Dec 3, 2020
- Largest scope
- —
- Listed value
- $6
- partial · often understated
Permit & project history
8 projectsInstalling a generator that will be natural gas fed. we will also install a 20kwh battery backup at this residence
Installing a generator that will be natural gas fed. we will also install a 20kwh battery backup at this residence
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 10235 Gooding Dr
What is being installed at 10235 Gooding Dr?
A City of Dallas permit describes installing a natural-gas-fed generator and a 20 kWh battery backup at the residence. The electrical permit is RES-ELC-26-000922, filed Feb. 17, 2026.
Is a new building being constructed at 10235 Gooding Dr?
The listed permits describe work at a residence, including a generator and battery backup installation. They do not describe construction of a new building.
When was the generator permit filed for 10235 Gooding Dr?
The electrical permit for the natural-gas-fed generator and 20 kWh battery backup was filed Feb. 17, 2026.
What is permit RES-PLM-26-000965 for?
The City of Dallas plumbing permit, filed Jan. 23, 2026, describes a gas test and backup generator.
Is there a battery backup planned at 10235 Gooding Dr?
Yes. The Feb. 17, 2026 electrical permit describes installing a 20 kWh battery backup along with a natural-gas-fed generator.
Is 10235 Gooding Dr a commercial project?
The listed permits identify work at this address as residential, including a generator installation and a gas test.
Also being built nearby
All of 75229- 10243 Gooding DrSep 16, 2026To build new 8 ft board on board wooden fence · 20 m away
- 10215 Gooding DrMar 2, 2026Overhead reroute · 49 m away
- 10230 Better DrAug 13, 2026Install sink and hose bib · 93 m away
- 10239 Better DrApr 7, 2026Hvac install: carrier performance a2l 3.5 ton up to 16.5seer2 80% 99kbtu gas heat split sys 1stage condenser 2 stage furnace and var blower · 114 m away
- 4074 South Better DrSep 22, 2025Install a cedar wood board on board fence not to exceed 9' in height with 3 gates and 1 wrought iron motorized gate. gate and fence in front yard will not be over 4' in height. fence does not cross utility easement · 137 m away
- 10223 Better DrNov 18, 2026* create a new garage door opening approximately 21’ wide × 7’ high, subject to final field verification and approvedengineering requirements.* perform the necessary demolition and structural modifications to the existing exterior wall.* provide temporary structural support as required during construction.* furnish and install the necessary lvl header beam, structural framing, columns, reinforcement, anchors, andconnections according to the approved engineering plans.patio cover new covered patio with an approximately 20’ × 20’ structural footprint.* furnish and install necessary structural framing, support posts, lvl beams, rafters, ceiling joists, blocking,anchors, and structural connections according to the approved engineering plans.* install required concrete foundations and structural supports as specified by the approved plans.* construct the new gable-style roof with an approximately 4:12 pitch, as shown in the approved design.* include approximately 2’6” roof overhangs where indicated by the plans.* complete necessary structural connections and reinforcement where the new patio roof attaches to the existing house · 140 m away
- 10307 Gooding DrAug 26, 2025Installation of 48kw generac backup generator · 176 m away
- 10270 Better DrSep 28, 2026Install new 8 ft wood fence where shown on plan · 178 m away
- 10315 Gooding DrOct 27, 2025Water repipe thru attic · 184 m away
- 10314 Gooding DrNov 17, 2025Gas line to pool heater · 184 m away
- 10323 Gooding DrOct 29, 2026Red ladder roofing proposes a complete removal and replacement of the existing roof at 10323 gooding drive with a new davinci province slateroofing system in the customer-approved color.special attention will be given to protecting the existing standing seam metal roofs below the replacement area. protective measures will bemaintained during removal and installation to help preserve the metal panels, seams, and finish.our scope includes removal of the existing roofing down to the decking, inspection and preparation of the roof surface, new underlayment andwaterproofing details and penetration accessories, and installation of the province slate field tiles with matching starter, rake, hip, and ridgecomponents. inspection and detailing of existing roof flashings, with replacement where required by condition, compatibility, or davinci’s installationrequirements.particular attention will be given to the details that determine the performance and appearance of a specialty slate roof: proper tile spacing,fastening and decking penetration, valley drainage, roof-to-wall flashing, transition tiles, and clean alignment of the finished roof. installation willfollow davinci’s published requirements and applicable local requirements.the proposal also includes property protection, debris disposal, final cleanup, and a completion inspection. completion photographs and applicablewarranty documentation will be provided for the owner’s records and to assist with the home’s sale. concealed damage discovered during removalwill be documented and presented for written approval before additional repairs are performed.provide completion photographs, product information, and applicable manufacturer warranty documentation · 192 m away
- 10224 Best DrOct 14, 2026Install new hvac · 193 m away