11105 Shady Trl
Dallas, TX 75229
Electrical permits filed for 11105 Shady Trail
Dallas records show commercial electrical permits at 11105 Shady Trail, including a May 2026 filing for an inspection with no electrical work. A May 12 permit request says the site needed an inspection to restore power; an earlier clean-and-show permit was filed September 17, 2025.
Summarized from City of Dallas records · updated May 14, 2026
- Projects
- 13
- 13 filings
- Latest filing
- May 14, 2026
- since Jan 19, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsWe were waiting for our dealership license, our electric bill was unpaid and our power got disconnect for few month, we want to get power back but txu emailed us that we have get inspection done from city, we already have certificate of occupancy, have to get no work electric inspection done to get our power back
We were waiting for our dealership license, our electric bill was unpaid and our power got disconnect for few month, we want to get power back but txu emailed us that we have get inspection done from city, we already have certificate of occupancy, have to get no work electric inspection done to get our power back
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 11105 Shady Trl
What is happening at 11105 Shady Trail in Dallas?
Dallas records show commercial electrical permits related to inspection and electrical service. The May 14, 2026, permit description specifies that no work was performed.
Is new construction planned at 11105 Shady Trail?
The records provided list three commercial electrical permits, not a new construction project. They do not specify any construction plans.
Why was an electrical permit filed at 11105 Shady Trail?
A May 12, 2026, permit description says the applicant needed a city inspection to get power restored. It also says the site already had a certificate of occupancy.
When were permits filed for 11105 Shady Trail?
The three permit filings were dated September 17, 2025, May 12, 2026, and May 14, 2026.
What does permit COM-ELC-26-002131 cover?
Filed May 14, 2026, COM-ELC-26-002131 is described as a finish-out permit to open electrical services, with no work performed.
What does permit COM-ELC-25-001976 cover?
Filed September 17, 2025, COM-ELC-25-001976 is described as a clean-and-show permit with no work specified.
Also being built nearby
All of 75229- 11126 Shady TrlOct 14, 2026Qteam inhouse interior alteration of an existing commercial suite for use as a used motor vehicle dealership office for vehicle sales, customer transactions, title processing, and related administrative activities. the work includes the removal of existing interior partition walls and reconfiguration of approximately 166 square feet of interior space, as shown on the submitted floor plan. no vehicle repair or body work will be performed inside the suite · 121 m away
- 11129 Shady TrlOct 20, 2025Install electrical service for building house lighting (hlts). connect three existing exterior lights and two existing gate operator controllers to new electrical service · 145 m away
- 11056 Shady TrlAug 14, 2026Need power for clean and show - vacant suite · 154 m away
- 11054 Shady TrlNov 2, 2026Electrical release for clean and show · 159 m away
- 11052 Shady TrlAug 14, 2026Need power for clean and show - vacant space · 165 m away
- 11034 Shady TrlOct 21, 2026Clean and show permit · 214 m away
- 11078 Morrison LnSep 18, 2025Complete service replacement. includes installation 200 amp 30-40 circuit main panel , meter base, disconnect,riser, wire & main grounding system. validation co number 2406131165 · 216 m away
- 11144 Morrison LnSep 9, 2025Electrical release no work · 217 m away
- 11141 Shady TrlDec 5, 2025This estimate includes running a gas test on property for owner to insure no leaks on the system. there's only one fixtude present on site which is an hvac furnace. this price does not includes any leak search leak or locate, prices may change if theres any issues onsite. we will fill the system with around 5psi to insure no issues on the gas run. this will be permitted and inspected by the city to insure property owner can get his gas turned on.mshut down gas supply and pressurize the lines with air to monitor and diagnose the source of gas leaks · 218 m away
- 11150 Morrison LnJun 15, 2026Atmos locked out meter, gas test passed · 225 m away
- 11029 Shady TrlOct 14, 2026Zo, bc add a wall to build a recording room in the front · 231 m away
- 11145 Shady TrlSep 19, 2025No work · 242 m away