2527 Royal Ln
Dallas, TX 75229
2527 Royal Ln: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 2527 Royal Ln, Dallas, TX 75229 since October 20, 2020. The most recent, filed December 9, 2020, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Dec 9, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Dec 9, 2020
- since Oct 20, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2527 Royal Ln
What is being built at 2527 Royal Ln?
The latest filing (City of Dallas permit 2011231056, December 9, 2020) covers erect attached sign.
How many permits and filings does 2527 Royal Ln have?
3 filings across 3 projects, from October 20, 2020 to December 9, 2020.
What is being built near Southwestern National Bank in Dallas?
2527 Royal Ln is about 58 m from Southwestern National Bank (2534 Royal Lane). Its latest filing is for erect attached sign.
Is there other construction near 2527 Royal Ln?
Yes. Nearby filings include 2525 Royal Ln (tenant improvement to an existing commercial space. the scope of work includes removing an existing interior partition. the project also includes removing an existing door and replacing it with a new rolling door at the same general opening. work will include any necessary framing, wall repair, and finish work associated with the partition removal and rolling door installation. no other changes to the existing building are proposed under this permit, Sep 14, 2026); 2533 Royal Ln (new hvac systems, Nov 16, 2026); 2534 Royal Lane (southwestern national bank — renovation/alteration — tenant finish out of an existing lease space into a branch bank, Nov 11, 2024).
How do I get alerts for new permits at 2527 Royal Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75229- 2525 Royal LnSep 14, 2026Tenant improvement to an existing commercial space. the scope of work includes removing an existing interior partition. the project also includes removing an existing door and replacing it with a new rolling door at the same general opening. work will include any necessary framing, wall repair, and finish work associated with the partition removal and rolling door installation. no other changes to the existing building are proposed under this permit · 8 m away
- 2533 Royal LnNov 16, 2026New hvac systems · 23 m away
- 2534 Royal Lane · Southwestern National BankNov 11, 2024Southwestern national bank — renovation/alteration — tenant finish out of an existing lease space into a branch bank · 58 m away
- 2534 Royal Ln · Fire Pan KbbqFeb 26, 2025Fire pan kbbq — renovation/alteration — interior finish out by new tenant · 58 m away
- 2534 Royal Ln. Tenant 127 · Iyk Texas CorpNov 21, 2024Aritaum hmart remodeling — renovation/alteration — 435 sq ft interior finish-out for retail space · 58 m away
- 2534 Royal Ln · Cap't LouiNov 12, 2026Providing work for electrical generator set up · 58 m away
- 2505 Royal Ln · G&i Ix Royal Ln. LLCJul 29, 2024Eberl — renovation/alteration — second generation interior office renovation · 84 m away
- 11414 Reeder RdSep 11, 2026Expo bu zo interior alteration of an existing 5,353-square-foot commercial space for dmaison event venue. relocate and alter the men's and women's restrooms (144 square feet each), alter a 144-square-foot kitchen, and construct storage partitioning within approximately 400 square feet. total alteration area is approximately 832 square feet. no building addition, exterior work, or work in the public right-of-way · 120 m away
- 11420 Reeder RdNov 2, 2020Interior remodel to reduce unit size · 137 m away
- 11422 Reeder RdOct 30, 2020Renovation of an existing warehouse space · 144 m away
- 2558 Royal LnJan 12, 2021Erect attached sign · 152 m away
- 2560 Royal LnFeb 5, 2026Install 4 ton a/c system (electric) with duct replacement · 161 m away