3254 Townsend Dr
Dallas, TX 75229
Home sewer, plumbing and HVAC work at 3254 Townsend Dr
City of Dallas permits indicate residential repair and replacement work at 3254 Townsend Dr, including a sewerline repair by tunnel filed April 6, 2026. Other records show a gas water heater installation filed March 1, 2026, and a single-system HVAC replacement filed October 10, 2025.
Summarized from City of Dallas records · updated Apr 6, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Apr 6, 2026
- since Oct 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 3254 Townsend Dr
What is being built at 3254 Townsend Dr?
The permits indicate repair and replacement work at a residence, not a new building. Work includes a sewerline repair by tunnel, a gas water heater installation, and an HVAC system replacement.
Is a new house being built at 3254 Townsend Dr?
The records for this address do not show a new-house permit. They describe repairs and replacements at a residence.
What sewer work is planned at 3254 Townsend Dr?
A City of Dallas residential plumbing permit describes a sewerline repair by tunnel. It was filed April 6, 2026, under permit RES-PLM-26-003603.
Is a new water heater being installed at 3254 Townsend Dr?
A City of Dallas permit describes installation of a 40-gallon gas water heater. The filing date is March 1, 2026; the permit number is RES-PLM-25-004366.
Is HVAC work happening at 3254 Townsend Dr?
Yes. A residential mechanical permit describes replacement of a 3-ton single-system unit. It was filed October 10, 2025, under permit RES-MEC-25-003068.
What permits have been filed for 3254 Townsend Dr?
City of Dallas records include a sewerline repair permit filed April 6, 2026, a water heater permit filed March 1, 2026, and an HVAC replacement permit filed October 10, 2025. A plumbing remodel permit was also filed March 6, 2020.
Also being built nearby
All of 75229- 3234 Townsend DrOct 3, 2026Electrical for new house · 44 m away
- 3228 Townsend DrJun 16, 2025Gas test for meter release · 57 m away
- 3222 Townsend DrMar 16, 2026Access and 6ft tunnel for sewer repairs under master bathroom · 71 m away
- 3223 Townsend DrAug 28, 202517 ft tunnel to repair sewer leak · 72 m away
- 3233 Dothan LnMar 17, 2026Meter and riser repair after tree branch damage · 83 m away
- 3216 Townsend DrNov 3, 2026Replace main sewer line and clean-outs · 84 m away
- 3227 Dothan LnMar 2, 2026Install new 8ft fence · 86 m away
- 3221 Dothan LnMay 25, 2026Hvac · 91 m away
- 3251 Dothan LnOct 18, 2026New build · 95 m away
- 3244 Dothan LnOct 29, 2026New hvac · 100 m away
- 3257 Dothan LnDec 29, 20253.5 ton deluxe 80% gas system – upflow system · 103 m away
- 3250 Dothan LnNov 15, 2026New plumbing · 106 m away