3442 St Cloud Cir
Dallas, TX 75229
Water heater and sewer work at 3442 St Cloud Cir
City of Dallas records list residential plumbing permits for two water heater replacements and a sewer service replacement at 3442 St Cloud Cir. The sewer permit was filed November 10, 2025, and the water heater permit was filed November 18, 2025. The records do not specify a project valuation.
Summarized from City of Dallas records · updated Nov 18, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Nov 18, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 3442 St Cloud Cir
What work is permitted at 3442 St Cloud Cir?
Dallas records list a sewer service replacement and two water heater replacements. The permits were filed November 10 and November 18, 2025.
Is a new home being built at 3442 St Cloud Cir?
The listed permits describe plumbing work, not new home construction. They cover a sewer service replacement and two water heater replacements.
When was the sewer replacement permit filed at 3442 St Cloud Cir?
The sewer service replacement permit, RES-PLM-25-007271, was filed November 10, 2025. Its description says the work involves tunneling under the slab to replace cast iron.
How many water heaters are being replaced at 3442 St Cloud Cir?
The City of Dallas permit description says two water heaters are being replaced. Permit RES-PLM-25-007683 was filed November 18, 2025.
How much will the plumbing work at 3442 St Cloud Cir cost?
The 2025 permit records do not include a reported valuation, so they do not state the cost of the work.
Also being built nearby
All of 75229- 3438 St Cloud CirMar 13, 2026Mcr installation of a 18 modules - roofmounted - 7.380 kw dc, 5.760 kw ac with 225a mpu · 25 m away
- 3454 St Cloud CirNov 17, 2026Relocate panel from outside to inside, garage conversion into a primary bedroom with bathroom, office and closet · 69 m away
- 3457 St Cloud CirSep 16, 2025Permanent generator: generac 22kw standby generator and 200a automatic transfer switch installation. fuel type: ng · 75 m away
- 3461 St Cloud CirOct 30, 2020Foundation repair · 88 m away
- 3427 St Cloud CirAug 7, 2025Gas pressure test · 97 m away
- 3465 St Cloud CirDec 9, 2020Install energy storage system · 98 m away
- 3462 St Cloud CirSep 4, 2025Sewer line replacement · 105 m away
- 11615 Sonnet DrNov 16, 2026Full system install · 108 m away
- 3466 St Cloud CirMay 13, 2026Replace 4 ton complete · 115 m away
- 3466 St Cloud CirApr 15, 2026Install 40 gallon electric water heater in bedroom closet (swap out) · 115 m away
- 3423 St Cloud CirJul 16, 20251” gas manifold rebuild and replacement of flex line · 120 m away
- 11616 Sonnet DrJun 23, 2025Tunnel job/sewer line repair · 140 m away