3566 Princess Ln
Dallas, TX 75229
Permits filed for a 24 kW home backup generator
City of Dallas permits filed February 2, 2026, indicate installation of a residential 24 kW backup generator at 3566 Princess Ln. A separate plumbing permit covers a dedicated above-ground gas line for the generator.
Summarized from City of Dallas records · updated Feb 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 2, 2026
- since Feb 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3566 Princess Ln
What is being installed at 3566 Princess Ln?
City of Dallas permits indicate a residential 24 kW backup generator and a dedicated above-ground gas line for it.
When were permits filed for the generator at 3566 Princess Ln?
Both City of Dallas permits were filed February 2, 2026.
What is permit RES-ELC-26-000564 for?
The City of Dallas electrical permit, filed February 2, 2026, covers installation of a residential 24 kW backup generator.
What is permit RES-PLM-26-001181 for?
The City of Dallas plumbing permit, filed February 2, 2026, covers a dedicated above-ground gas line for a backup generator.
Is a backup generator planned for this Dallas home?
A City of Dallas electrical permit indicates installation of a residential 24 kW backup generator at 3566 Princess Ln.
Also being built nearby
All of 75229- 3541 Princess LnSep 16, 2020Install new roof over existing roof · 27 m away
- 3536 Princess LnNov 20, 2025Hvac replacement. install 3 ton gas horizontal complete system · 86 m away
- 3551 Ainsworth DrApr 28, 2026Whole home filtration system with rpz · 97 m away
- 3562 Ainsworth DrFeb 10, 2026Install electrical on remodel and addition · 108 m away
- 3539 Ainsworth DrMay 21, 2026X installing 35 total pilings (21 exterior, 14 breakouts). x adjusting 3 existing pilings.x installing a fully functioning gutter system with downspout extensions · 111 m away
- 3554 Duchess TrlMar 11, 2026Installing 8' fence · 116 m away
- 3515 Princess LnAug 14, 2026Whole home water re-pipe. eliminate water lines under slab, run new lines through attic (with pex) to each fixture · 131 m away
- 3542 Duchess TrlNov 14, 20253542 duchess install 6 concrete pilings to stabilize foundation · 134 m away
- 3516 Princess LnDec 11, 2025Service upgrade · 143 m away
- 3625 Duchess TrlMay 20, 2025Electrical for new detached garage · 143 m away
- 3536 Duchess TrlAug 19, 20261.5 electric system run ductwork · 143 m away
- 3612 Princess LnOct 12, 2026Hvac work · 149 m away