5-ton gas HVAC system permitted at 3822 Weeburn Dr
A 5-ton gas HVAC system, including a condenser, furnace and evaporator coil, is being installed at 3822 Weeburn Dr. The City of Dallas issued the residential mechanical permit on July 6, 2026 (RES-MEC-26-003449).
Summarized from City of Dallas records · updated Jul 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 6, 2026
- since Jul 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3822 Weeburn Dr
What is being installed at 3822 Weeburn Dr?
A City of Dallas permit describes installation of a 5-ton gas HVAC system with a condenser, furnace and evaporator coil.
When was the HVAC work permitted at 3822 Weeburn Dr?
The residential mechanical permit was filed on July 6, 2026.
What is the permit number for 3822 Weeburn Dr?
The permit number is RES-MEC-26-003449.
Is a new home being built at 3822 Weeburn Dr?
The record is for a residential mechanical permit to install an HVAC system; it does not describe new home construction.
What type of HVAC system is planned for 3822 Weeburn Dr?
The permit describes a 5-ton gas system with a condenser, furnace and evaporator coil.
Also being built nearby
All of 75229- 3830 Weeburn DrMar 23, 2026Ductworkexhaust fansdryervent hood · 14 m away
- 3808 Weeburn DrSep 2, 2025Foundation repair · 25 m away
- 3843 Weeburn DrNov 11, 2026Electrical remodel · 30 m away
- 3784 Weeburn DrNov 10, 2025Gas test · 68 m away
- 3778 Weeburn DrJul 11, 20255 ton air handler and condenser · 79 m away
- 3783 Shady Hill DrJun 23, 2025Replace 5ton base horizontal coil / condenser · 122 m away
- 3782 Shady Hill DrNov 13, 2026Under slab sewer replacement · 132 m away
- 3759 Weeburn DrOct 6, 2020Replace water service · 138 m away
- 3740 Weeburn DrApr 21, 2026Re roof, remove shingles and apply synthetic underlayment, ice and water shield in the valleys and around the chimneys, apply new gat timberline shingles · 147 m away
- 3788 Shady Hill DrFeb 10, 2026Replacement of cast iron piping for building drain with pvc · 149 m away
- 3734 Weeburn DrJun 26, 2026New construction · 158 m away
- 3741 Weeburn DrJun 10, 2026Dig up and remove valve box to access 3/4” gate valve in front yard for removal. will install 3/4” pvc x copper transition fitting with new 3/4” threaded ball valve and rebuild pvc line in front of the ball valve with copper, replacing free standing boiler drain. will also run shut off for hose bib in front of the ball valve for winterizing and future work on bib. will replace current round valve box with 12” rectangular box, filled with pea gravel to prevent corrosion and ground erosion · 173 m away