3988 Cedarbrush Dr
Dallas, TX 75229
8,185-square-foot new home permitted on Cedarbrush Drive
City of Dallas records show a demolition permit filed May 14, 2025, followed by a permit for a new 8,185-square-foot home at 3988 Cedarbrush Dr on September 25, 2025. Plumbing, electrical and HVAC permits for the new construction were filed in 2026.
Summarized from City of Dallas records · updated Jul 1, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jul 1, 2026
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 3988 Cedarbrush Dr
What is being built at 3988 Cedarbrush Dr?
City of Dallas records indicate an 8,185-square-foot new home. The residential new construction permit is RES-NEW-25-000701, filed September 25, 2025.
When was the new home at 3988 Cedarbrush Dr permitted?
The new construction permit was filed September 25, 2025. The City of Dallas also recorded plumbing and electrical permits in February 2026 and an HVAC permit in July 2026.
Was a building demolished at 3988 Cedarbrush Dr?
A City of Dallas residential demolition permit, RES-DEM-25-000013, was filed May 14, 2025.
How large is the new home at 3988 Cedarbrush Dr?
The new construction permit description lists the home as 8,185 square feet.
What HVAC work is permitted at 3988 Cedarbrush Dr?
The mechanical permit description says three new HVAC systems are being installed for new construction. Permit RES-MEC-26-003392 was filed July 1, 2026.
Also being built nearby
All of 75229- 3965 Cedarbrush DrApr 16, 2026Remodel / addition · 53 m away
- 3950 Cedarbrush DrSep 9, 2025Remove (1) layer of existing composition shinglesinstall new metal/drip edge (where applicable)install synthetic felt underlayment. install a new dimensional fiberglass shingle roof replace all existing vent boots with new lead vent flashing (where applicable) paint vent flashing to match new roof. reset and seal chimney flashing (where applicable)r&r existing ventilationinstall new valley protection (metal valley or ice and water shield (determined by local building codes)seal all penetrations.r&r gutters (per scope)clean and stain fence (per scope)clean up roof related debris outside of house and magnetically roll yard; haul off all debris to a proper disposal site · 83 m away
- 3930 Cedarbrush DrJun 15, 2026New gas service for generator · 126 m away
- 3931 Cedarbrush DrMay 20, 2025Over 6 ft fence was built by previous owner. we are new homeowners and requesting fence permit so we can complete pool build · 126 m away
- 3918 Goodfellow DrJun 25, 2025Install 50 gallon gas water heater in garage closet (swap out) · 128 m away
- 3919 Goodfellow DrMay 4, 2026Addition and remodeling of some areas of the property · 139 m away
- 3910 Cedarbrush DrNov 16, 2026Electrical work for residential renovation · 168 m away
- 3959 Goodfellow DrMay 20, 2026Excavate one outside pit and tunnel 18 ft beneath the foundation to access and replace approximately 20 ft of 3/4? hot-water supply piping, then backfill · 178 m away
- 3920 Hockaday DrNov 11, 2025Gas test · 193 m away
- 3929 Shady Hill DrJul 31, 2025Mcr with battery solar panel installation · 210 m away
- 3930 Hockaday DrApr 7, 2026Gas line to fire bowls, pool heater, & fire pit · 212 m away
- 3923 Shady Hill DrOct 14, 2025New return and supply plenumsnew disconnect and whipexisting concrete padmanual dampers on all supply connections to the supply plenumscut in new return in the front room to lower static pressure on the return side of the system for best performance and efficiency.increase the supply 12" supply duct going to the master/study/bath/closet and cut in new supply with boot/grille to the front room with a one way grille which will throw the air into the foyer/stairs area. the static pressure (resistance of the air moving through system) is really high. these modifications will lower the pressure and will allow the system to run more efficiently. opening all of the supply grilles all of the way will also help. exactly where the heavy resistance is unknown. we can't follow the ducts going all the way to the boots in the living room or master/study/bath/closet, therefore we can't guarantee the comfort in these areas. sometimes we are limited on what we can do because of the build of the home.the return and supply modifications add $1350 to the job. the modifications can be removed from the job, but moss cannot be responsible for performance issues due to high static pressure.city permitnew drain pan with safety float switchflush copper line setpressurize and vacuum line set prior to releasing refrigerantcharge system to manufacture’s specificationsreconnect to existing copper, electrical and primary drain line · 213 m away