10417 Shadow Bend Dr
Dallas, TX 75230
2-ton AC condenser and air handler replacement in Dallas
A 2-ton condenser and air handler are being replaced at 10417 Shadow Bend Dr, according to a City of Dallas residential mechanical permit filed September 9, 2026. The permit description names Rheem equipment.
Summarized from City of Dallas records · updated Sep 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2026
- since Sep 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10417 Shadow Bend Dr
What is being built at 10417 Shadow Bend Dr?
The City of Dallas permit describes a 2-ton condenser and air handler changeout at the residence. It is an equipment replacement, not a new building permit.
Is there a new building going up at 10417 Shadow Bend Dr?
The record is for residential mechanical work, not new construction. It describes replacing a 2-ton condenser and air handler.
When was the AC replacement permit filed at 10417 Shadow Bend Dr?
The City of Dallas filed permit RES-MEC-26-004984 on September 9, 2026.
What size AC system is being replaced at 10417 Shadow Bend Dr?
The permit description specifies a 2-ton condenser and an air handler changeout.
What does permit RES-MEC-26-004984 cover?
It covers residential mechanical work at 10417 Shadow Bend Dr: a 2-ton condenser and air handler changeout. The description names Rheem equipment.
Also being built nearby
All of 75230- 10421 Shadow Bend DrOct 5, 20264 ton base straight ac horizontal system · 9 m away
- 10401 Shadow Bend DrJul 22, 2026Residential reroofremove and replace 1 single layer · 35 m away
- 10437 Shadow Bend DrSep 15, 2026Replace 1- 50 gallon electric water heater · 45 m away
- 10407 Pagewood DrSep 18, 2025Gas pressure test · 90 m away
- 10408 Pagewood DrFeb 4, 2026Replace 50 gal gas water heater in garage · 103 m away
- 10422 Pagewood DrAug 18, 2026Replacing the gas water heater · 105 m away
- 10430 Pagewood DrMay 4, 2026Atmod turned gas off need release · 108 m away
- 10432 Pagewood DrJun 15, 2026This used to be a duplex, sewer lines connected to each other in alley way. these units are being sold as a seprate units. remove 4' wye fitting and run new 4inch sewer line to alley way ready for new city sewer tap. pipe has been bedded in and is on test · 109 m away
- 6931 Meadow RdMay 22, 2026Concrete:drive:1300 sq ft-4000 psi, #3 rebar, 18oc-finish: broom-4" thick-base: flex compactedapproach: 190 sq ft each x 2 = 380 total-4000 psi, #4 rebar, 18oc-6" thick-base flex, compacted-red wood per code-dowels: #6, smooth, 12" oc-street: rebar #4, 24" long, 12" oc, withepoxy-finish: broomnote: meadow road is concrete road withasphalt overlay · 159 m away
- 6918 Waggoner PlJan 4, 2021Residential remodel with bathrooms and kitchen updates: plumbing · 166 m away
- 6910 Waggoner PlOct 22, 2026Installation of a 22kw generator with a 200amp ats, and natural gas connections · 171 m away
- 6906 Waggoner PlJun 13, 2025Partial building drain replacement on right side of home replacing washing machine, kitchen line and full hallway, bathroom drain lines totaling 45 foot of pipe replacement under slab. system is on test via toilet flange on right side of home and hallway bathroom · 173 m away