10519 Ravenscroft Dr
Dallas, TX 75230
Roof replacement and sewer-line work at Dallas home
City of Dallas permit records show roof replacement and sewer-line repiping at this residence. The sewer work was filed on July 8, 2026, under permit RES-PLM-26-007037; the roof replacement was filed on July 28, 2026, under permit RES-ROOF-26-001280.
Summarized from City of Dallas records · updated Jul 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 28, 2026
- since Jul 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 10519 Ravenscroft Dr
What work is happening at 10519 Ravenscroft Dr?
City of Dallas records show a roof replacement and repiping of 25 feet of the main sewer line for a half bath, using a 32-foot tunnel.
Is a new home being built at 10519 Ravenscroft Dr?
The records provided show residential roof and plumbing permits, not a new-home construction permit.
When was the sewer-line work filed at 10519 Ravenscroft Dr?
The sewer-repipe permit, RES-PLM-26-007037, was filed on July 8, 2026.
When was the roof replacement permit filed at 10519 Ravenscroft Dr?
The roof-replacement permit, RES-ROOF-26-001280, was filed on July 28, 2026.
How much of the sewer line is being repiped at 10519 Ravenscroft Dr?
The permit description specifies 25 feet of the main sewer line for a half bath, with a 32-foot tunnel.
Also being built nearby
All of 75230- 10517 Ravenscroft DrOct 2, 2025Sewer repipe · 3 m away
- 10524 Ravenscroft DrSep 16, 2026Remove and replace the existing main sewer line located in the yard from the home to the city tap or connection point · 16 m away
- 10532 Ravenscroft DrJan 6, 2026Re route kitchen and branch line full bathroom to sewer main in back yard · 26 m away
- 10540 Ravenscroft DrJan 16, 2026Jack hammer inside house and tunnel 6 ft to leak · 39 m away
- 7408 Woodthrush DrJan 21, 2026Upgrade panel · 43 m away
- 7432 Woodthrush DrMar 5, 2026Sewer replacement under the slab · 50 m away
- 7440 Woodthrush DrAug 14, 2026Remove shingles and underlayment. install 35year ir shingles, synthetic underlayment and ice & water shield in valleys and around accessories · 56 m away
- 10545 Boedeker StJul 29, 2026Running gas to generator · 95 m away
- 10511 Boedeker StSep 29, 2025Installation, repair, or replacement · 95 m away
- 7408 Wellcrest DrJul 30, 2026Sewer spot repair in tunnel · 128 m away
- 10536 Egret LnAug 4, 2026Gas service line for stove. 5 ft. under house · 129 m away
- 7424 Wellcrest DrJun 9, 2026Duplex. 7424 and 7426 main building sewer and drain line replacement · 129 m away