10602 Stone Canyon Rd
Dallas, TX 75230
Electrical upgrade filed for Building 5 at 10602 Stone Canyon Rd
A commercial electrical permit filed Aug. 21, 2026, describes an upgrade to a 13-bank system at Building 5, including a new 400-amp switch. The record does not describe construction of a new building.
Summarized from City of Dallas records · updated Aug 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2026
- since Aug 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10602 Stone Canyon Rd
What is being built at 10602 Stone Canyon Rd?
A City of Dallas electrical permit describes an upgrade to a 13-bank system at Building 5, including a new 400-amp switch. It does not describe a new building.
What work is planned at Building 5 at 10602 Stone Canyon Rd?
The permit describes an upgrade to a 13-bank system and installation of a new 400-amp switch.
When was the electrical permit filed for 10602 Stone Canyon Rd?
The City of Dallas permit was filed Aug. 21, 2026.
What is the permit number for work at 10602 Stone Canyon Rd?
The permit number is COM-ELC-26-003267. It is a commercial electrical permit filed Aug. 21, 2026.
Is a new building going up at 10602 Stone Canyon Rd?
The permit record describes electrical work at Building 5, not construction of a new building.
Also being built nearby
All of 75230- 10611 Northboro StJun 23, 2026Ran new gas service line & reroute gas line above in attic · 103 m away
- 10615 Northboro StJan 12, 202650 gallon gas water heater · 103 m away
- 7608 Highmont StJan 20, 2026Replacing existing unit with a carrier infinity variable speed 3 ton 21.5 seer2 heat pump system with 9 kw back up electric heat · 105 m away
- 7604 Highmont StAug 12, 2025200 amp panel and meter base replacement · 110 m away
- 10633 Northboro StJun 19, 20263 ton base upflow heat pump system · 111 m away
- 7619 Pebblestone DrOct 1, 2026Replace meter base · 130 m away
- 10815 Sandpiper LnJun 30, 2026We are replacing hvac system · 173 m away
- 10570 Stone Canyon RdSep 9, 2025Install boiler, necessary piping for water and gas, rpz and vent pipe- boiler system · 175 m away
- 10805 Sandpiper LnFeb 8, 2026Replacement of 3-ton 19 seer up-flow heat-pump system (air handler and condenser) · 177 m away
- 7520 Highmont StJul 22, 2026Gas has been off 6 months so we need gas insp · 210 m away
- 7512 Highmont StMar 13, 20263-ton heat pump level 1 complete system replacement · 219 m away
- 7517 Pebblestone DrMay 14, 2026Gas test-no work · 220 m away