10743 Preston Rd
Dallas, TX 75230 · Wellspring Preston, LLC
Interior remodel registered for 10743 Preston Road
An interior remodel is planned at 10743 Preston Road, with a 2,500-square-foot renovation registered under the name SEROTONIN on October 30, 2026. Dallas permit filings dated November 3 and November 10 describe interior alterations and plumbing work; the applicant’s estimated project cost is $450,000.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 10, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Nov 10, 2026
- since Jun 24, 2026
- Largest scope
- 2,500 sf
- Estimated cost
- $450K
- state registration
Where this project stands
In state plan reviewSEROTONIN
2,500 sq ft · $450K est.
- RegisteredOct 30, 2026
- Plan reviewnow
- ConstructionNov '26 – Mar '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
7 projectsBu zo we are remodeling an interior of an existing building included but not limited to: floor, paint, walls, cabinets, hvac, plumbing, ada, etc.. - we also have the engineering plans attached for review
Bu zo we are remodeling an interior of an existing building included but not limited to: floor, paint, walls, cabinets, hvac, plumbing, ada, etc.. - we also have the engineering plans attached for review
City of Dallas permitCommercial Alteration Addition Permit2,500 sq ft interior remodel, floors, cabinets, paint, walls, etc. — serotonin
TDLR project registrationRenovation/AlterationProject Registered2,500 sq ft$450K est.- Project #
- TABS2027004814
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
## scope of work* **permits & compliance:** pull standard sewer and excavation permits with the city of dallas.* **site safety:** provide barricades, safety cones, and shoring as needed for open trenches and access holes to secure the work areas.* **sawcutting & demolition:** sawcut, remove, and haul off concrete for the following four (4) designated areas: * two (2) 6?×6? access holes in the parking lot to correct pipe misalignment. * one (1) 110?×2? wide trench in the vacant suite where the plastic surgery center was to replace all bad cast iron. * one (1) 75?×2? wide trench in the service hall between the vacant suite and clinic to replace a bad cast iron.* **excavation:** excavate the designated trenches and access holes to expose existing deficient and misaligned sewer connections.* **sewer line repairs:** perform necessary structural repairs on the exposed deficient sewer lines to ensure proper alignment, flow, and sealing.* **backfill & compaction:** backfill excavated areas and compact soil to standard engineering specifications to prevent future settling.* **concrete restoration:** pour concrete back over the repaired trenches and access holes, matching the thickness and finish of the existing surrounding concrete.* **inspections:** coordinate and perform all necessary municipal plumbing/structural inspections.* **site cleanup:** clean all work areas, wash down surfaces as needed, and haul off all debris, old piping, and unused spoils.* **notes:** overtime to complete service hallway included.***## exclusions:1. permits, engineering review, re-submittal fees, or special third-party inspections beyond the standard city of dallas sewer permit.2. repair, replacement, or modifications to any piping, utilities, or structures outside the explicitly defined dimensions of the (2) 6?×6? holes and the 110-foot and 75-foot trenches.3. bypass pumping, temporary sanitary facilities, or maintaining continuous sewer service during active repair windows unless explicitly contracted.4. removal, relocation, or protection of unforeseen underground utilities or obstructions not clearly mapped or identified prior to excavation.5. rock excavation, addressing highly unstable/unsuitable subsurface soils, or handling groundwater conditions requiring specialized dewatering equipment.6. hazardous material handling, testing, or abatement (e.g., asbestos, contaminated soil, or groundwater contamination).7. restoration of landscaping, asphalt, parking lot striping, irrigation lines, curbs, or interior/exterior finishes beyond the immediate concrete sawcut zones.8. traffic control measures beyond standard barricades, such as hired flagmen, police assistance, or full street/lane closures.9. structural modifications to the building's main slab, foundation footings, or grade beams.10. premium time, after-hours, weekend, or phased scheduling unless explicitly detailed in the final agreement.11. delays or additional logistical costs resulting from severe weather or unforeseen subsurface obstructions.12. warranty of any existing piping or connections not explicitly replaced or repaired under this scope of work.****please note: this is a continuation of permit # com-plm-26-002786
## scope of work* **permits & compliance:** pull standard sewer and excavation permits with the city of dallas.* **site safety:** provide barricades, safety cones, and shoring as needed for open trenches and access holes to secure the work areas.* **sawcutting & demolition:** sawcut, remove, and haul off concrete for the following four (4) designated areas: * two (2) 6?×6? access holes in the parking lot to correct pipe misalignment. * one (1) 110?×2? wide trench in the vacant suite where the plastic surgery center was to replace all bad cast iron. * one (1) 75?×2? wide trench in the service hall between the vacant suite and clinic to replace a bad cast iron.* **excavation:** excavate the designated trenches and access holes to expose existing deficient and misaligned sewer connections.* **sewer line repairs:** perform necessary structural repairs on the exposed deficient sewer lines to ensure proper alignment, flow, and sealing.* **backfill & compaction:** backfill excavated areas and compact soil to standard engineering specifications to prevent future settling.* **concrete restoration:** pour concrete back over the repaired trenches and access holes, matching the thickness and finish of the existing surrounding concrete.* **inspections:** coordinate and perform all necessary municipal plumbing/structural inspections.* **site cleanup:** clean all work areas, wash down surfaces as needed, and haul off all debris, old piping, and unused spoils.* **notes:** overtime to complete service hallway included.***## exclusions:1. permits, engineering review, re-submittal fees, or special third-party inspections beyond the standard city of dallas sewer permit.2. repair, replacement, or modifications to any piping, utilities, or structures outside the explicitly defined dimensions of the (2) 6?×6? holes and the 110-foot and 75-foot trenches.3. bypass pumping, temporary sanitary facilities, or maintaining continuous sewer service during active repair windows unless explicitly contracted.4. removal, relocation, or protection of unforeseen underground utilities or obstructions not clearly mapped or identified prior to excavation.5. rock excavation, addressing highly unstable/unsuitable subsurface soils, or handling groundwater conditions requiring specialized dewatering equipment.6. hazardous material handling, testing, or abatement (e.g., asbestos, contaminated soil, or groundwater contamination).7. restoration of landscaping, asphalt, parking lot striping, irrigation lines, curbs, or interior/exterior finishes beyond the immediate concrete sawcut zones.8. traffic control measures beyond standard barricades, such as hired flagmen, police assistance, or full street/lane closures.9. structural modifications to the building's main slab, foundation footings, or grade beams.10. premium time, after-hours, weekend, or phased scheduling unless explicitly detailed in the final agreement.11. delays or additional logistical costs resulting from severe weather or unforeseen subsurface obstructions.12. warranty of any existing piping or connections not explicitly replaced or repaired under this scope of work.****please note: this is a continuation of permit # com-plm-26-002786
City of Dallas permitCommercial Plumbing PermitScope of work* **permits & compliance:** pull standard sewer and excavation permits with the city of dallas
Scope of work* **permits & compliance:** pull standard sewer and excavation permits with the city of dallas
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 10743 Preston Rd
What is being built at 10743 Preston Road?
Records describe an interior remodel, not a new building. A 2,500-square-foot renovation was registered as SEROTONIN on October 30, 2026, under TDLR project number TABS2027004814.
Is a new medical facility opening at 10743 Preston Road?
The filings describe interior remodeling and plumbing work but do not identify a future use or confirm that a new medical facility is opening. A September 17 plumbing permit mentions sewer repairs near a vacant suite formerly used by a plastic surgery center.
How much will the 10743 Preston Road renovation cost?
The applicant estimated the project cost at $450,000 in the TDLR registration filed October 30, 2026. That is an estimate, not a confirmed final cost.
What plumbing work is planned at 10743 Preston Road?
Dallas plumbing permit COM-PLM-26-003674, filed September 17, 2026, describes sewer-line repairs and concrete restoration in designated parking-lot and interior areas. The filing says the work continues permit COM-PLM-26-002786.
What's being remodeled near Marmi on Preston Road?
An interior renovation is registered at 10743 Preston Road, about 160 meters from Marmi at 10720 Preston Road. The TDLR registration dated October 30, 2026, lists 2,500 square feet.
What permits were filed for 10743 Preston Road?
Recent filings include a commercial alteration permit dated November 3, 2026 (COM-ALT-ADD-26-002362) and a plumbing permit dated November 10, 2026 (COM-PLM-26-004300). A TDLR renovation registration was filed October 30 under TABS2027004814.
Also being built nearby
All of 75230- 10729 Preston RdDec 8, 2020Electrical repairs · 26 m away
- 10763 Preston RdJan 15, 2021Erect attached sign · 37 m away
- 10711 Preston Road · Castlebrook RealtyOct 21, 2025Standridge companies — renovation/alteration — tenant improvement · 59 m away
- 10711 Preston RdDec 16, 202525.0395 standridge ste 222commercial interior remodel · 59 m away
- 10703 Preston RdNov 3, 2020Interior remodel only · 74 m away
- 6017 Royal LnSep 28, 2026Qteam meeting 5.12..2026 (9am) construct new shell retail building · 147 m away
- 6015 Orchid LnMay 4, 2026Inspect gas line · 152 m away
- 5915 Orchid LnFeb 5, 2026Gas repair · 156 m away
- 6025 Royal Ln · Preston Royal Village Nec LLCOct 15, 2026Soto method - preston royal - dallas, tx — renovation/alteration — interior tenant remodel, no change in use · 157 m away
- 6025 Royal Lane · Preston Royal Village Nec (edens), LLCAug 18, 2026Purple — renovation/alteration — existing space, new tenant, interior alteration · 157 m away
- 10720 Preston RdJul 20, 2026Replace/install water heater · 160 m away
- 10720 Preston Road · Sepr Regency LLCApr 22, 2026Marmi — renovation/alteration — interior tenant renovations for marmi store · 160 m away
More demolitions in 75230, medical facilities in 75230, parking structures in 75230.