11525 St Michaels Dr
Dallas, TX 75230
Water-heater work permitted at 11525 St Michaels Dr
City of Dallas records show a residential plumbing permit filed September 2, 2026, to install one 50-gallon electric water heater in the basement at 11525 St Michaels Dr. An earlier permit filed July 7, 2025, covered replacing a 40-gallon electric water heater.
Summarized from City of Dallas records · updated Sep 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 2, 2026
- since Jul 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 11525 St Michaels Dr
What is happening at 11525 St Michaels Dr?
City of Dallas permits indicate work on electric water heaters at this residence: a replacement in 2025 and a basement installation in 2026.
Was a new home permitted at 11525 St Michaels Dr?
The two records provided are residential plumbing permits for water-heater work. They do not describe a new home.
What does the 2026 permit cover at 11525 St Michaels Dr?
Permit RES-PLM-26-009269, filed September 2, 2026, covers installing one 50-gallon electric water heater in the basement.
When was the water heater work permitted at 11525 St Michaels Dr?
The latest permit was filed September 2, 2026. An earlier water-heater replacement permit was filed July 7, 2025.
What was the 2025 plumbing permit for at 11525 St Michaels Dr?
Permit RES-PLM-25-002172, filed July 7, 2025, covered replacing a 40-gallon electric water heater.
Is the work at 11525 St Michaels Dr residential or commercial?
The records classify both permits as residential plumbing permits.
Also being built nearby
All of 75230- 11535 St Michaels DrAug 25, 20263.5 bath home, we will access the plumbing underneath the home at the parent beam and remove and existing sewer piping. the existing piping will be replaced with new schedule 40 pvc.the tub overflow/drain area will be removed and replaced as needed to properly connect to the new sewer system.a new cleanout will be installed for future access and maintenance.new plumbing will be properly supported with hangers attached to the joists every 3-5 feet to maintain the proper slope and secure the new piping · 12 m away
- 11516 St Michaels DrJun 16, 2025Gas test + repairs - locked gas meter · 16 m away
- 11607 St Michaels DrApr 24, 2026Demolish burned house, carport and foundations to dirt; remove piers 2’ below existing grade. remove driveway to approach. remove retaining wall & steps back fence to remain. import a couple of loads of dirt to spread out & rough grade. load, transport, and legally dispose of resultant debris · 107 m away
- 7315 Malabar LnApr 1, 2026Reroof shingles like with like · 110 m away
- 11616 St Michaels DrSep 18, 2026Replace 2" gas riser by home · 118 m away
- 7243 Baxtershire DrMay 29, 2025Nsfaa-residential addition · 123 m away
- 7332 Malabar LnDec 18, 2020Build swimming pool and spa · 126 m away
- 11626 St Michaels DrJul 13, 2026Replacing a 200 amp panel, a 100 amp sub-panel, grounding and surge protection · 129 m away
- 7240 Baxtershire DrMay 28, 20266 lights. 15 recelptacles · 133 m away
- 11430 St Michaels DrNov 10, 2026Installing gas line for 26kw generator · 137 m away
- 7340 Malabar LnDec 9, 2020Sewer relay · 141 m away
- 7407 Baxtershire DrJul 24, 2025Gen gas line · 157 m away