11940 Jamestown Rd
Dallas, TX 75230
Roofing and foundation repairs at 11940 Jamestown Rd
City of Dallas permits show a reroof at 11940 Jamestown Rd on May 6, 2025, and residential foundation work on September 25, 2025. The foundation permit describes installing seven steel pilings.
Summarized from City of Dallas records · updated Sep 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 25, 2025
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 11940 Jamestown Rd
What work is permitted at 11940 Jamestown Rd?
City of Dallas records show a reroof and residential foundation repair. The foundation work is described as installing seven steel pilings.
When was the reroof permit filed at 11940 Jamestown Rd?
The City of Dallas record is dated May 6, 2025. Its permit number is RES-ROOF-25-000010.
What foundation work is planned at 11940 Jamestown Rd?
The September 25, 2025, permit describes installing seven steel pilings. Its permit number is RES-FDN-25-000503.
Is a new building being built at 11940 Jamestown Rd?
The records provided show a reroof and foundation repair, not a new-building permit.
How many permits are listed for 11940 Jamestown Rd?
The records list two City of Dallas permits: one for roofing and one for residential foundation repair.
Also being built nearby
All of 75230- 11932 Jamestown RdMar 4, 2026Replacing 5 ton gas complete system · 14 m away
- 11948 Jamestown RdNov 17, 2026Remove existing roofing materials as needed and install approximately 35.33 square feet of new roofing. work includes preparation of the roof surface, installation of appropriate underlayment and roofing materials, flashing as required, and cleanup of all roofing debris upon completion · 27 m away
- 5907 Lindenshire LnJul 31, 2025Section city walkway section curb&gutter · 48 m away
- 11915 Jamestown RdNov 5, 2025Mcr with battery solar panels to be installed · 92 m away
- 5775 Ridgetown CirMar 30, 2026Remove and haul off the back section of fence along the alley, install all new fence posts and board on board cedar fence along the south and east sides of the property. there was an existing sliding gate that we also reinstalled. the new fence is 8' tall, board on board cedar, with top cap, trim, and ground contact board · 136 m away
- 5943 Lindenshire LnNov 4, 2020Install water heater · 146 m away
- 5916 Willow LnJan 8, 2021Remodel existing plumbing · 153 m away
- 5915 Willow LnOct 30, 2025Relocating the electrical service and upgrading panel · 163 m away
- 5924 Willow LnApr 15, 2026Fencec · 165 m away
- 5950 Lindenshire LnDec 3, 2025Replace 2 ton above the tub hvac unit · 168 m away
- 5827 Lindenshire LnDec 11, 202550 gallon gas water heater · 169 m away
- 5951 Lindenshire LnSep 18, 2026Replacing 2.5 ton gas complete system · 171 m away