Pool demolition and new patio planned at 12212 Park Forest Dr
Permits indicate the existing pool, pool deck, coping and equipment pad will be demolished, with a 446-square-foot concrete patio and 241-square-foot patio cover planned. The alteration permit was filed September 16, 2025; an electrical permit filed October 9, 2025, covers four lights and a ceiling fan in the patio cover.
Summarized from City of Dallas records · updated Oct 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 9, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa-demolition existing pool, pool deck, coping, and equipment pad. pour new 446sf concrete patio, 241sf patio cover w. electrical
Nsfaa-demolition existing pool, pool deck, coping, and equipment pad. pour new 446sf concrete patio, 241sf patio cover w. electrical
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 12212 Park Forest Dr
What is being built at 12212 Park Forest Dr?
A City of Dallas permit filed September 16, 2025, describes demolishing the existing pool, deck, coping and equipment pad and pouring a new 446-square-foot concrete patio with a 241-square-foot patio cover.
Is the pool at 12212 Park Forest Dr being removed?
Yes. Permit RES-ALT-ADD-25-000852 describes demolition of the existing pool, pool deck, coping and equipment pad.
How big is the new patio at 12212 Park Forest Dr?
The permit describes a 446-square-foot concrete patio and a 241-square-foot patio cover.
Will the patio cover at 12212 Park Forest Dr have lights?
A residential electrical permit filed October 9, 2025, describes installing four lights and one ceiling fan in the patio cover.
When was work permitted at 12212 Park Forest Dr?
The City of Dallas filed alteration permit RES-ALT-ADD-25-000852 on September 16, 2025, and electrical permit RES-ELC-25-003685 on October 9, 2025.
Is a new pool planned at 12212 Park Forest Dr?
The available permit describes demolishing the existing pool and building a patio and patio cover; it does not mention a replacement pool.
Also being built nearby
All of 75230- 12211 Park Forest DrOct 13, 2026Change out a 3 ton a/c condenser, evaporator coil, and furnace · 13 m away
- 12219 Park Forest DrJul 25, 2026Single hvac system change out · 14 m away
- 12225 Park Bend DrJun 19, 20263 ton base gas horizontal system · 85 m away
- 12218 Park Bend DrJun 3, 2026Gas repair · 95 m away
- 12226 Park Bend DrJul 11, 2025Wire new patio cover · 97 m away
- 7107 Lake Edge DrFeb 25, 2026Installation of an air conditioning system in the expansion of a new addition to the house · 104 m away
- 12116 Edgestone RdSep 18, 2026Installing 40kw backup generator ats to gen 10'custom pad by builder2 - 200a ats installed by builder · 151 m away
- 12143 Lueders LnJan 6, 2026Repair gas leak · 166 m away
- 7014 Stone Meadow DrNov 19, 2025Install new rheem 50 gallon gas water heater · 190 m away
- 12414 Breckenridge DrSep 10, 2025Install 2 new navien 240a2 tankless water heaters · 194 m away
- 12022 Edgestone RdOct 15, 2025Hvac change out · 201 m away
- 6935 Stone Meadow DrAug 27, 2026Replace existing water heater located in attic · 202 m away