12663 Sunlight Dr
Dallas, TX 75230
Generator and Level 2 EV charger permits at 12663 Sunlight Dr
Residential permits at 12663 Sunlight Dr indicate installation of a 26-kilowatt standby generator and a Level 2 EV charger. The generator permit was filed Nov. 18, 2025, a gas-line permit followed Dec. 11, 2025, and the EV charger permit was filed April 7, 2026.
Summarized from City of Dallas records · updated Apr 7, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 7, 2026
- since Nov 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsLevel 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <45 feet new 3?4” emt conduit to power the level 2 ev charger at 40amp constant draw
Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <45 feet new 3?4” emt conduit to power the level 2 ev charger at 40amp constant draw
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 12663 Sunlight Dr
What is being installed at 12663 Sunlight Dr?
City of Dallas permits indicate a 26-kilowatt standby generator and a Level 2 EV charger. The generator permit also specifies a 200-amp automatic transfer switch and natural gas connections.
Is a new home being built at 12663 Sunlight Dr?
The records provided show residential electrical and plumbing permits for a generator and an EV charger, not a new-home construction permit.
When was the generator permitted at 12663 Sunlight Dr?
The City of Dallas filed residential electrical permit RES-ELC-25-004625 on Nov. 18, 2025, for a 26-kilowatt standby generator.
What is the gas-line permit for at 12663 Sunlight Dr?
Residential plumbing permit RES-PLM-25-008741, filed Dec. 11, 2025, describes running a gas line to a generator.
When was the EV charger permitted at 12663 Sunlight Dr?
The City of Dallas filed residential electrical permit RES-ELC-26-001980 on April 7, 2026, for a Level 2 EV charger.
What kind of EV charger is planned for 12663 Sunlight Dr?
The permit describes a Level 2 charger powered by a 50-amp circuit breaker, with a stated 40-amp constant draw.
Also being built nearby
All of 75230- 12661 Sunlight DrOct 6, 2026Change-out of full hvac system, no ductwork · 9 m away
- 12657 Sunlight DrOct 23, 2026Asphalt shingle replacement · 24 m away
- 12649 Sunlight DrNov 17, 20255 foot sewer tunnel to repair broken pipe · 52 m away
- 12676 Sunlight DrOct 14, 2020Install water heater · 54 m away
- 12645 Sunlight DrAug 4, 2025Replace overheating panel and install 1st responder · 67 m away
- 12644 Sunlight DrAug 27, 2025Replace interior hot and cold water lines with uponor pex pipe · 67 m away
- 12641 Sunlight DrOct 7, 2020Remove existing roof and install new roof · 84 m away
- 6215 Lafayette WayNov 8, 2024Nsfd · 91 m away
- 6130 Prestoncrest LnJul 20, 2026Gas test and shut off valve replacement · 103 m away
- 6222 Lafayette WayDec 10, 2020Install fence · 114 m away
- 12621 Sunlight DrOct 23, 2026Replacing federal pacific panel with new 200a panel · 115 m away
- 12612 Sunlight DrNov 2, 2020Remove existing roof and install new roof · 126 m away