groundranger
Active · latest filing Sep 2026Residential

54 Masland Cir

Dallas, TX 75230

Residential plumbing, HVAC and roof work at 54 Masland Cir

Dallas permits at 54 Masland Cir record residential plumbing, HVAC and roof work, not a new building. The filings run from October 16, 2025, to September 14, 2026, and include a plumbing repair, an HVAC system installation and roof replacement.

Summarized from City of Dallas records · updated Sep 14, 2026

Projects
3
3 filings
Latest filing
Sep 14, 2026
since Oct 16, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Tunnel under house to fix back fall

    Tunnel under house to fix back fall

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-009708
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 3 ton deluxe straight cool 80% gas system – horizontal

    3 ton deluxe straight cool 80% gas system – horizontal

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-26-003665
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Removing existing damaged roof and replacing with new roof. no structural changes are being made

    Removing existing damaged roof and replacing with new roof. no structural changes are being made

    City of Dallas permitResidential Roofing Permit
    Record
    RES-ROOF-25-001047
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 54 Masland Cir

What is being built at 54 Masland Cir in Dallas?

The permits record maintenance and repair work at a residence, not a new building. The work includes plumbing, HVAC and roof repairs.

When were permits filed for work at 54 Masland Cir?

The three City of Dallas permit records are dated October 16, 2025, July 14, 2026, and September 14, 2026.

What plumbing work is planned at 54 Masland Cir?

A September 14, 2026, residential plumbing permit, RES-PLM-26-009708, describes a tunnel under the house to fix backfall.

Is there HVAC work at 54 Masland Cir?

Yes. A July 14, 2026, mechanical permit, RES-MEC-26-003665, describes a 3-ton deluxe straight-cool system with an 80% gas system, installed horizontally.

Is the roof being replaced at 54 Masland Cir?

A residential roofing permit dated October 16, 2025, describes removing the damaged roof and replacing it with a new roof, with no structural changes.

Also being built nearby

All of 75230
Get alerts for 54 Masland Cir