5440 Harvest Hill
Dallas, TX 75230 · Bpre Toll Hill Holdings LP
Office interior renovation planned at 5440 Harvest Hill
A 5,491-square-foot interior renovation of existing office space at 5440 Harvest Hill was registered on June 11, 2025. The TDLR record, named “Siepe 2024 Expansion,” lists an estimated project cost of $330,000 and a closed status.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2025
- since Jun 11, 2025
- Largest scope
- 5,491 sf
- Estimated cost
- $330K
- state registration
Where this project stands
CompletedSiepe 2024 Expansion
5,491 sq ft · $330K est.
- RegisteredJun 11, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInterior renovation of existing office space in high rise building. — toll hill east
TDLR project registrationRenovation/AlterationProject Closed5,491 sq ft$330K est.- Project #
- TABS2025021052
- Tenant / owner
- Siepe 2024 Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5440 Harvest Hill
What is being built at 5440 Harvest Hill?
The TDLR record describes a 5,491-square-foot interior renovation of existing office space in a high-rise building. It does not indicate a new building.
When was the office renovation at 5440 Harvest Hill permitted?
The project was registered with the Texas Department of Licensing and Regulation on June 11, 2025. The record is TABS2025021052.
What is the Siepe 2024 Expansion project in Dallas?
“Siepe 2024 Expansion” is the name listed for a TDLR-registered renovation at 5440 Harvest Hill. The record describes interior work in existing office space.
How large is the renovation at 5440 Harvest Hill?
The TDLR registration lists the project at 5,491 square feet.
How much is the 5440 Harvest Hill office renovation estimated to cost?
The applicant's estimated cost is $330,000, according to the TDLR registration. This is an estimate, not a reported total project cost.
Is the 5440 Harvest Hill renovation still underway?
The TDLR record lists the project status as closed.
Also being built nearby
All of 75230- 5440 Harvest Hill Road · Bpre Toll Hill Holdings LPAug 18, 2026Rp texas mgt, llc initial improvements — renovation/alteration — interior renovation of existing office space in office building
- 5440 Harvest Hill RdSep 16, 2026Relocate 2x4, installing 5 duplex outlets
- 12846 Inwood RdSep 23, 2020Permanent electrical service · 95 m away
- 12235 Montego PlzNov 21, 2025Replace meter base · 199 m away
- 12212 Montego PlzJan 26, 2026Run gas test on existing lines · 208 m away
- 12210 Montego PlzNov 13, 2026Re-roof of main structure · 209 m away
- 12249 Montego PlzMay 22, 2026Nsfaa-construction of an 169 sq ft metal, and plexiglass enclosed patio cover with sliding door · 212 m away
- 5310 Harvest Hill West Road · Bpre Toll Hill Holdings LPMar 13, 2025Spots — renovation/alteration — interior renovation of existing office space in high rise building · 217 m away
- 5310 Harvest Hill Road · Bpre Toll Hill Holdings LPMay 29, 2024Fbh wellness 2023 expansion — renovation/alteration — renovation of existing office space in high-rise office building · 217 m away
- 5310 Harvest Hill Rd · Bpre Toll Hill Holdings, LPJun 30, 2026Electrical remodel · 217 m away
- 12595 Montego PlzMay 19, 2026Hvac system replacement · 217 m away
- 12253 Montego PlzAug 21, 2025Replace hvac system · 217 m away
More offices in 75230.