5515 Meletio Ln
Dallas, TX 75230
Water and sewer line work, plus a gas water heater
City of Dallas permits document residential plumbing work at 5515 Meletio Ln, including water line replacements, a gas water heater installation, and sewer line replacement. The first permit was filed December 22, 2025, and the latest was filed October 12, 2026.
Summarized from City of Dallas records · updated Oct 12, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 12, 2026
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 5515 Meletio Ln
What work is permitted at 5515 Meletio Ln?
Three City of Dallas plumbing permits record water line replacement, installation of a 50-gallon gas water heater, and sewer line replacement.
When was the latest permit filed at 5515 Meletio Ln?
The latest permit, RES-PLM-26-010871, was filed October 12, 2026, for replacing the sewer line from the house to the city tap.
Was a water line replaced at 5515 Meletio Ln?
Yes. Permit RES-PLM-25-009170, filed December 22, 2025, covers replacing the water line from the meter to the house.
Was a new water heater installed at 5515 Meletio Ln?
A permit filed January 2, 2026, records installation of a 50-gallon gas water heater in the hallway closet. The permit number is RES-PLM-26-000022.
Is a new building being constructed at 5515 Meletio Ln?
The three records provided are residential plumbing permits for water and sewer line work and a water heater installation; they do not describe new building construction.
Also being built nearby
All of 75230- 5509 Meletio LnOct 27, 2020Install swimming pool · 12 m away
- 5521 Meletio LnNov 12, 2025Wire swimming pool · 12 m away
- 5503 Meletio LnAug 12, 2026Replace outside drain · 25 m away
- 5544 Meletio LnOct 20, 2025Ufer inspection · 62 m away
- 5548 Meletio LnOct 15, 2026Nsfaa resid new constr · 69 m away
- 12417 Quincy LnSep 1, 2026Gas test with permit for atmos to unlock meter and turn gas back on to home · 81 m away
- 12423 Quincy LnJul 28, 2025Install new meter base · 84 m away
- 5506 Charlestown DrNov 13, 2020Demolition sfd · 115 m away
- 5525 Charlestown DrDec 17, 2025Fence install · 120 m away
- 5517 Charlestown DrMay 15, 2026Replace 3 ton cond/coil · 122 m away
- 5533 Williamstown RdOct 28, 2025Complete repipe of sewer system. under pier and beam home servicing two full bathrooms, one kitchen sink, one laundry, 1 condensation drain. this home has a slab addition for a master bathroom and bedroom when that slab was poured , it was bored on top of the sewer mainline on the back side of the house , going to the alley. there is a 20 foot tunnel under that slab. the main line under that slab has also been replaced out to double sweep clean outs... all connections were made just below floor level · 128 m away
- 5510 Williamstown RdMay 27, 2025Hvac changeout · 129 m away