Gas test permit filed at 5944 Mcshann Rd
A City of Dallas residential plumbing permit records a gas test at 5944 Mcshann Rd. The permit was filed June 19, 2026, under permit number RES-PLM-26-006361; the record does not describe new construction.
Summarized from City of Dallas records · updated Jun 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 19, 2026
- since Jun 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5944 Mcshann Rd
What is being built at 5944 Mcshann Rd?
The City of Dallas permit record describes a gas test under a residential plumbing permit, not a new building. It was filed June 19, 2026.
What work is the permit for at 5944 Mcshann Rd?
The permit records a gas test. It is permit RES-PLM-26-006361, filed June 19, 2026.
When was the gas test permit filed?
The City of Dallas filed the residential plumbing permit on June 19, 2026.
Is a new home being built at 5944 Mcshann Rd?
The available permit record does not indicate a new home. It describes a gas test.
What's happening near Adelmo's Ristorante & Bar on Preston Road?
At 5944 Mcshann Rd, about 188 meters from Adelmo's Ristorante & Bar, a City of Dallas permit records a residential gas test filed June 19, 2026.
Also being built nearby
All of 75230- 12721 Preston RdDec 2, 2025Gas test to have gas turned back on · 100 m away
- 5959 Bonnard DrAug 5, 2026Did a gas pressure test · 102 m away
- 5955 Bonnard DrJan 4, 2021Install water heater · 104 m away
- 12700 Preston RdJun 25, 2026Removing and replacing 4 rooftop units · 109 m away
- 6022 Prestoncrest LnSep 14, 2020Cell tower equipment/ antenna upgrade · 144 m away
- 6031 Prestoncrest LnApr 20, 2026Gas test for release and bring the water heater up to code · 157 m away
- 6047 Prestoncrest LnSep 22, 2026Furnish and install new concrete driveway and drive approach at 6047 preston crest lane, dallas, tx 75230 (lot 15, block 2/7449, preston crest addition). scope includes demolition of existing concrete as required, forming, placement of concrete paving for the private driveway and the city drive approach, and finish work for a complete installation of approximately 1,056 square feet. work to be performed by caststone solutions company, a city of dallas bonded paving contractor (bond #89040995). construction to comply with city of dallas paving standards for drive approaches and sidewalks. no building structure work. no sidewalk-only scope beyond what is required for the drive approach connection. no street lane closure proposed unless otherwise directed by the city · 183 m away
- 12817 Preston Rd · Adelmo's Ristorante & BarAug 10, 2026Adelmo's ristorante & bar — renovation/alteration — interior finishout · 188 m away
- 12821 Preston RdOct 2, 2026Bu zo change out two light pole fixtures to led lights. change out7 perimeter light fixtures on building to led lights. add 1 new lightpole base and light pole. all light fixtures are standard lightscurrently. we will be switching all lights to led lights. light pole thatis being added is in the island in the parking lot and traffic will notbe affected · 197 m away
- 12541 Renoir LnJun 24, 2026Run gas line to generator · 201 m away
- 12540 Renoir LnOct 16, 2025Replace condenser and coil only · 205 m away
- 12829 Preston Rd · Pv 634 Preston Ltd.Oct 23, 2026Electrical remodel · 215 m away