5959 Royal Ln
Dallas, TX 75230
Permit filed for Pilates studio at 5959 Royal Ln
A Dallas permit filed November 13, 2026, describes alteration and addition work for a Pilates studio at 5959 Royal Ln. Earlier permits filed in July 2025 describe plans for a full-service restaurant and commercial kitchen in suite 625; the records do not name a tenant or give an opening date.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 13, 2026
- Projects
- 38
- 38 filings
- Latest filing
- Nov 13, 2026
- since Nov 13, 2026
- Largest scope
- —
- Estimated cost
- $480K
- state registration
Permit & project history
38 projectsClean and show electrical meter release no work currently vacant need power to show this vacancy to potential new tenants
Clean and show electrical meter release no work currently vacant need power to show this vacancy to potential new tenants
City of Dallas permitCommercial Electrical PermitElectrical wire was cut at the disconnect and stolen from the restaurant. this is a emergency situation
Electrical wire was cut at the disconnect and stolen from the restaurant. this is a emergency situation
City of Dallas permitCommercial Electrical PermitSupply labor to accept the walk-in delivery onsite, assemble the new indoor cooler / freezer combo box and cooler / cooler combo box and install the remote refrigeration equipment for the new coolers and freezer
Supply labor to accept the walk-in delivery onsite, assemble the new indoor cooler / freezer combo box and cooler / cooler combo box and install the remote refrigeration equipment for the new coolers and freezer
City of Dallas permitCommercial Mechanical PermitNew commercial kitchen- a full service restaurant to be built within suite 625. this includes a new commercial kitchen. work includes construction of interior walls/partitions wall fixtures, flooring, ceiling, light fixtures, fixtures and mechanical, electrical and plumbing
New commercial kitchen- a full service restaurant to be built within suite 625. this includes a new commercial kitchen. work includes construction of interior walls/partitions wall fixtures, flooring, ceiling, light fixtures, fixtures and mechanical, electrical and plumbing
City of Dallas permitCommercial Electrical PermitClean and showelectrical meter releaseno workcurrently vacantneed power to show this vacancy to potential new tenants
Clean and showelectrical meter releaseno workcurrently vacantneed power to show this vacancy to potential new tenants
City of Dallas permitCommercial Electrical PermitClean and showelectrical meter releaseno workcurrently vacantneed power to show this vacancy to potential new tenants
Clean and showelectrical meter releaseno workcurrently vacantneed power to show this vacancy to potential new tenants
City of Dallas permitCommercial Electrical PermitThe certificate of occupancy for this suite was originally combined with suite 537 (chico's). on a recent visit from the fire marshal, the fire marshal stated that each suite would need a separate c of o so applications for c of o's for both suite 533 & 537 were applied for. in the response for the c of o application for this suite 533 in co-25-000405 the city stated "based on the plans provided, there were layout changes made to the suite when compared to the last remodel permit that was done. a remodel permit will be needed before a certificate of occupancy can be applied for. " thus we are making application for this permit using the most recent remodel plans
The certificate of occupancy for this suite was originally combined with suite 537 (chico's). on a recent visit from the fire marshal, the fire marshal stated that each suite would need a separate c of o so applications for c of o's for both suite 533 & 537 were applied for. in the response for the c of o application for this suite 533 in co-25-000405 the city stated "based on the plans provided, there were layout changes made to the suite when compared to the last remodel permit that was done. a remodel permit will be needed before a certificate of occupancy can be applied for. " thus we are making application for this permit using the most recent remodel plans
City of Dallas permitCommercial Alteration Addition PermitWe will remove approximately 60’ of 3” cast iron pipe at ceiling height that connects to the building riser. - we will install new pvc pipe using new hangers where they are necessary to keep the proper slope on the drain line. - we will also cut and remove the sheet rock wall that is covering the cast iron riser to connect the new line. - after the 3” pipe has been replaced, we will remove the cast iron drain line that serves the upstairs men's and women’s restroom. - we will save the existing lead bends on the toilets. - we will be cutting the cast iron below the second-floor deck to transition all the cast iron pipe to pvc pipe. - after the toilet and vent pipes have been replaced, we will go to the second-floor restroom to cut the sheet rock wall to replace a cast iron vent that penetrates the upstairs slab. - after the demolition work has been completed on the cast iron drains on the ceiling, we will use the existing saw cuts in the suite to dig down and tunnel to expose the existing cast iron sanitary drain. - once the old cast iron sanitary drain has been exposed, we will remove the pipe. - we will run approximately 170’ of new sanitary drain using pvc pipe and fittings and install clean outs every 75’ to allow the line to be properly cleaned when necessary. - after the new drain has been installed, we will perform a static test on the drain line
We will remove approximately 60’ of 3” cast iron pipe at ceiling height that connects to the building riser. - we will install new pvc pipe using new hangers where they are necessary to keep the proper slope on the drain line. - we will also cut and remove the sheet rock wall that is covering the cast iron riser to connect the new line. - after the 3” pipe has been replaced, we will remove the cast iron drain line that serves the upstairs men's and women’s restroom. - we will save the existing lead bends on the toilets. - we will be cutting the cast iron below the second-floor deck to transition all the cast iron pipe to pvc pipe. - after the toilet and vent pipes have been replaced, we will go to the second-floor restroom to cut the sheet rock wall to replace a cast iron vent that penetrates the upstairs slab. - after the demolition work has been completed on the cast iron drains on the ceiling, we will use the existing saw cuts in the suite to dig down and tunnel to expose the existing cast iron sanitary drain. - once the old cast iron sanitary drain has been exposed, we will remove the pipe. - we will run approximately 170’ of new sanitary drain using pvc pipe and fittings and install clean outs every 75’ to allow the line to be properly cleaned when necessary. - after the new drain has been installed, we will perform a static test on the drain line
City of Dallas permitCommercial Plumbing PermitNon-structural tenant improvement project in an existing shopping center space. the project includes, demolition of non structural elements, new non-bearing partitions ,new plumbing and electrical. existing restroom, hvac and elec. service panel to remain — preston royal shopping center west
TDLR project registrationRenovation/AlterationReview Complete1,926 sq ft$480K est.- Project #
- TABS2024017274
- Tenant / owner
- 10017_lalaland Preston
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 5959 Royal Ln
What is being built at 5959 Royal Ln in Dallas?
A City of Dallas permit filed November 13, 2026, describes a Pilates studio. Earlier 2025 permit records describe restaurant and kitchen work in suite 625.
When was the Pilates studio permitted at 5959 Royal Ln?
The City of Dallas filed commercial alteration and addition permit COM-ALT-ADD-26-002671 on November 13, 2026. Its description is “Pilates studio.”
Is a restaurant planned at 5959 Royal Ln?
A July 2025 permit describes a full-service restaurant and new commercial kitchen within suite 625. The records do not identify the restaurant tenant or provide an opening date.
Which suite is the restaurant work at 5959 Royal Ln in?
The July 2025 electrical permit, COM-ELC-25-001175, says the planned full-service restaurant and kitchen are within suite 625.
When were the restaurant permits filed at 5959 Royal Ln?
Related permits were filed July 29 and July 31, 2025. They describe remodeling, air conditioning and kitchen exhaust systems, along with electrical work for a new commercial kitchen.
Is there an opening date for the Pilates studio or restaurant at 5959 Royal Ln?
The available City of Dallas permit records do not provide an opening date for either use.
Also being built nearby
All of 75230- 5959 Royal LaneJan 31, 2025Palladino's — renovation/alteration — a full service restaurant to be built within suite 635. this includes a new commercial kitchen. work includes, construction of interior walls /partitions, wall fixtures, flooring, ceiling, light fixtures and mechanical ,electrical and plumbing
- 5959 Royal Line · Amreit Preston Royal, LPApr 18, 2024Edens office - preston royal village — renovation/alteration — demise existing single-tenant suite into two separate suites. suite 208 to be "white box space". tenant finish-out to be by future tenants
- 5923 Royal LnJun 24, 2026Replace the defective irrigation backflow device with a new irrigation backflow device · 52 m away
- 5940 Royal LnOct 8, 2020Tornado damage repair · 78 m away
- 5938 Royal LnAug 7, 2026Relocate existing supply and return diffusers. replace 1 toilet exhaust fan · 80 m away
- 5938 Royal Lane · Meaders Leasehold, LLCFeb 26, 2026Bibbentuckers — renovation/alteration — interior remodel, approximately 2752 square feet · 80 m away
- 5950 Royal LnJun 18, 2025Install 1/2” rpz for dishwasher · 81 m away
- 5944 Royal Lane · Rla Prda Investments LPMay 28, 2026Campisi's preston and royal — renovation/alteration — interior remodel (1,170 sq ft) · 81 m away
- 5944 Royal LnSep 25, 2026Install 2 owner furnished exhaust hoods (type 1)install 2 owner furnished roof mounted exhaust fansinstall 2 owner furnished supply air fansmodify some of the duct work for the existing hvac split systems · 81 m away
- 5908 Royal LnJun 3, 2025Replacing a 4 ton heat pump complete system and complete duct replacement · 85 m away
- 5934 Royal LnOct 27, 2025Replace sewer line serving east side of building and new sewer service in parking area · 86 m away
- 10755 Villager RdDec 17, 2020Replace or modify existing hvac · 116 m away