6029 Forest Ln
Dallas, TX 75230 · Thrive Dental And Orthodontics
Thrive Dental and Orthodontics finish-out at 6029 Forest Lane
A 2,159-square-foot dental office finish-out for Thrive Dental and Orthodontics was registered at 6029 Forest Lane on September 6, 2024. The TDLR registration lists the project as closed and gives an estimated cost of $340,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 6, 2024
- since Sep 6, 2024
- Largest scope
- 2,159 sf
- Estimated cost
- $340K
- state registration
Where this project stands
CompletedThrive Dental and Orthodontics
2,159 sq ft · $340K est.
- RegisteredSep 6, 2024
- Plan review
- ConstructionSep '24 – Dec '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectDental office finish out — thrive dental and orthodontics
TDLR project registrationRenovation/AlterationProject Closed2,159 sq ft$340K est.- Project #
- TABS2025000364
- Tenant / owner
- Thrive Dental And Orthodontics
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6029 Forest Ln
What is being built at 6029 Forest Lane in Dallas?
A 2,159-square-foot dental office finish-out for Thrive Dental and Orthodontics was registered there. The TDLR project registration, dated September 6, 2024, lists the project as closed.
Is Thrive Dental and Orthodontics opening at 6029 Forest Lane?
A TDLR registration describes a dental office finish-out for Thrive Dental and Orthodontics at the address. It does not provide an opening date.
When was the dental office project at 6029 Forest Lane registered?
The TDLR project registration is dated September 6, 2024. Its project number is TABS2025000364.
How large is the Thrive Dental and Orthodontics project?
The TDLR registration lists the dental office finish-out as 2,159 square feet.
How much will the 6029 Forest Lane dental office project cost?
The applicant's estimated project cost in the TDLR registration is $340,000. This is an estimate, not a reported final cost.
What's going in near Naveb Family on Forest Lane?
A 2,159-square-foot dental office finish-out for Thrive Dental and Orthodontics was registered at 6029 Forest Lane, about 22 meters from the listed Naveb Family address at 6045 Forest Lane. The project registration is dated September 6, 2024.
Also being built nearby
All of 75230- 6021 Forest LnNov 21, 2025Demolition of a bank of america drive through awning · 11 m away
- 6045 Forest Lane · Naveb Family LPAug 18, 2026Shipley donuts — renovation/alteration — interior tenant alteration · 22 m away
- 6045 Forest LnOct 15, 2026Provide labor and materials to install hvac ductwork, air devices, exhaust fans, controls, and a type i kitchen hood system per plans, utilizing existing rtu-1 through rtu-3. excludes fire suppression, demolition, roofing work, test and balance, and items not specifically listed · 22 m away
- 11810 Preston Road · Line 5 Holdings LPDec 3, 202511810 preston — renovation/alteration — work includes improvements to an existing building including selective demolition to the buildings shell. new site and flat work and exterior finishes · 41 m away
- 11810 Preston Rd · Line Five HoldingsJul 23, 2026Move meter and disconnect · 41 m away
- 6063 Forest LnApr 13, 2026Scope:-remove roof system down to deck and haul away (2 layers)-install 4.4" iso insulation over entire roof area (per energy code)-install a 60 mil tpo roof system over entire roof area-install 60 mil tpo base flashings and extend up and over the parapet walls-flash in all pipe boots-flash in all roof vents-flash in all hvac units-install all new tpo pitch pans-detach and reset existing wood blocking with slip sheets underneath-fabricate and install perimeter edge metal to canopy area and the roof system-fabricate and install coping to front parapet wall-upon completion, tucker roofing systems will provide a 20 year n.d.l roof warranty · 48 m away
- 6065 Forest Ln · Concord Willingham LPDec 2, 2025Freeform chiropractic — renovation/alteration — tenant finish out · 50 m away
- 11803 Preston RdSep 18, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 51 m away
- 11811 Preston Rd · Concordcolt LPJul 15, 2026Tenant broke lease and moved out, need meter release to turn power on for clean and show · 52 m away
- 6067 Forest LnDec 30, 2025Duct modifications · 53 m away
- 6073 Forest LnNov 6, 2020Tc-2020-21099 10/6/2020 · 62 m away
- 11868 Preston RdOct 17, 2025Please confirm if this needs a permit at all. it is only bollard work. the exterior renovation project scope of work includes replacing andproposing new bollards to enhance the protection of the existing buildingand site features. existing bollards that are no longer needed shall beremoved. all new and replaced bollards shall provide the latest boa brandstandards for consistent color and appearance throughout the branch.overall, the improvements proposed to enhance the appearance and safetyof the development · 125 m away