6565 Dykes Way
Dallas, TX 75230
New single-family home permitted at 6565 Dykes Way
City of Dallas permits filed February 28, 2025, indicate new construction of a single-family dwelling at 6565 Dykes Way. Later filings cover an 8-foot cedar fence in November 2025 and a gas test in January 2026.
Summarized from City of Dallas records · updated Jan 28, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 28, 2026
- since Feb 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 6565 Dykes Way
What is being built at 6565 Dykes Way?
City of Dallas permit records describe new construction of a single-family dwelling. Plumbing and mechanical permits were filed February 28, 2025.
When were permits filed for the new home at 6565 Dykes Way?
The plumbing and mechanical permits for the new single-family dwelling were filed February 28, 2025.
Is 6565 Dykes Way a single-family or multi-family project?
The permit descriptions identify new construction of a single-family dwelling.
What work was permitted at 6565 Dykes Way in November 2025?
A residential accessory structure permit filed November 18, 2025, describes an 8-foot cedar board-on-board fence with metal posts.
Was gas work permitted at 6565 Dykes Way?
A residential plumbing permit filed January 28, 2026, describes a gas test for gas release. The record is permit RES-PLM-26-001044.
What are the permit numbers for the new home at 6565 Dykes Way?
The plumbing permit is 2502281077_198563540-002_PL_1, and the mechanical permit is 2502281077_198563540-002_ME_1. Both were filed February 28, 2025.
Also being built nearby
All of 75230- 6517 Dykes WayApr 27, 2026Variable speed 5-ton gas full system replacement · 125 m away
- 6511 Dykes WayJul 13, 2026Replacement of 4-ton evaporator coil · 141 m away
- 6510 Dykes WayJul 22, 20252 ton system - master bedroom · 141 m away
- 7 Milford PlSep 28, 2026Remove and replace two existing attic hvac systems. install one new lennox 3.5-ton gas, 16 seer2, single-stage system and one new lennox 2.5-ton gas, 16 seer2, single-stage system. work includes replacement of the existing heating and cooling equipment and connection to the existing ductwork, electrical, refrigerant, and gas systems as required · 147 m away
- 6555 Turner WayAug 6, 2025Repair overhead pole and meter base · 149 m away
- 6543 Turner WayAug 5, 2026Plumbing final · 158 m away
- 6554 Turner WayOct 26, 2020Remove existing roof and install new roof · 161 m away
- 6537 Turner WayAug 13, 2025Install of porch lights and receptacles on covered patio in backyard · 165 m away
- 6560 Lafayette WayJun 18, 2026Service upgrade · 173 m away
- 6525 Turner WaySep 4, 2025No power, replace damaged utility service riser and add grounding · 182 m away
- 6569 Lafayette WayDec 18, 2020Construct new sfd · 183 m away
- 6561 Lafayette WaySep 11, 2025Manual recreation 1903181070 - nsfd w attached 4 car garage · 186 m away
More new homes in 75230.