6615 Walnut Hill Ln
Dallas, TX 75230
6615 Walnut Hill Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6615 Walnut Hill Ln, Dallas, TX 75230. The most recent, filed September 5, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Sep 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2025
- since Sep 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6615 Walnut Hill Ln
What is being built at 6615 Walnut Hill Ln?
The latest filing (City of Dallas permit RES-PLM-25-004583, September 5, 2025) covers gas test.
How many permits and filings does 6615 Walnut Hill Ln have?
1 filing across 1 project, from September 5, 2025 to September 5, 2025.
Is there other construction near 6615 Walnut Hill Ln?
Yes. Nearby filings include 6603 Walnut Hill Ln (nsfaa i want to tear down the existing house, and build a new single family residential, Oct 26, 2026); 6631 Walnut Hill Ln (replacing 3 ton heat pump complete system, Sep 24, 2026); 6638 Walnut Hill Ln (demolish single family home approx. 2400 sq ft and attached garage includes removing all existing slab, Mar 16, 2026).
How do I get alerts for new permits at 6615 Walnut Hill Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75230- 6603 Walnut Hill LnOct 26, 2026Nsfaa i want to tear down the existing house, and build a new single family residential · 11 m away
- 6631 Walnut Hill LnSep 24, 2026Replacing 3 ton heat pump complete system · 14 m away
- 6638 Walnut Hill LnMar 16, 2026Demolish single family home approx. 2400 sq ft and attached garage includes removing all existing slab · 26 m away
- 9703 Thackery StOct 30, 2025Foundation repair-install 14 pilings · 77 m away
- 6521 Walnut Hill LnJan 6, 2021Addition of detached garage · 84 m away
- 6639 Joyce WayOct 28, 2025Dig up an replace 3/4" to 1/2 water line that feed freestanding hose bib and patio faucet. the valve box will be replaced and p gravel will be added as well to minimize oxidation to valves · 97 m away
- 6621 Joyce WaySep 25, 2026Demolition of house · 106 m away
- 6638 Joyce WayAug 25, 2025Replacing 5 ton base horizontal gas system · 110 m away
- 6717 Walnut Hill LnOct 28, 2026Replaced gas line in the backyard going into attic. 75 foot yard line and 12 foot gas line going into home · 113 m away
- 6611 Joyce WaySep 23, 2025Gas repipe · 113 m away
- 6614 Joyce WayNov 12, 2025Gas test and repair · 121 m away
- 6723 Walnut Hill LnSep 1, 2026Replace existing hvac equipment with new · 123 m away