6807 Azalea Ln
Dallas, TX 75230
6807 Azalea Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6807 Azalea Ln, Dallas, TX 75230. The most recent, filed August 22, 2025, covers: “Gas test + repairs”.
Compiled from City of Dallas records · updated Aug 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2025
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6807 Azalea Ln
What is being built at 6807 Azalea Ln?
The latest filing (City of Dallas permit RES-PLM-25-004022, August 22, 2025) covers gas test + repairs.
How many permits and filings does 6807 Azalea Ln have?
1 filing across 1 project, from August 22, 2025 to August 22, 2025.
Is there other construction near 6807 Azalea Ln?
Yes. Nearby filings include 6716 Azalea Ln (removal and replacement of 70ft,8ft tall board on board cedar fence.new fence will be cedar pickets,treated rails and one/2x6 treated kicboard.posts will be spaced out every 6 ft and will be installed 30 in he’s deep and holes will be filled with concrete.13 gauge steel posts will be used.building one walk-in gate of 40-48 inches wide, Oct 19, 2026); 6717 Azalea Ln (new install, new build, Nov 17, 2026); 6632 Azalea Ln (install gas line to pool heater, Mar 20, 2026).
How do I get alerts for new permits at 6807 Azalea Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75230- 6716 Azalea LnOct 19, 2026Removal and replacement of 70ft,8ft tall board on board cedar fence.new fence will be cedar pickets,treated rails and one/2x6 treated kicboard.posts will be spaced out every 6 ft and will be installed 30 in he’s deep and holes will be filled with concrete.13 gauge steel posts will be used.building one walk-in gate of 40-48 inches wide · 32 m away
- 6717 Azalea LnNov 17, 2026New install, new build · 62 m away
- 6632 Azalea LnMar 20, 2026Install gas line to pool heater · 74 m away
- 11033 Eastview CirMar 9, 2026Replace four hvac systems in residence · 75 m away
- 6618 Azalea LnOct 21, 2026Plumbing installation for new single family residence including domestic water distribution piping,sanitary drainage and ventilation · 103 m away
- 6916 Azalea LnNov 4, 2026Fence permit application for a new residential property · 123 m away
- 6923 Azalea LnJul 8, 2026Validate permit for electrical work done on entire new construction home · 134 m away
- 6924 Azalea LnSep 2, 2025Creating two new approach , 7in thickness , 3/4 in diles in red wood 1ft apart, #4 rebar and 18" oc. with brushed finish.the drive approaches are 35 ft apart · 138 m away
- 11107 Hillcrest RdMay 27, 2026Upgrading existing 100a electrical panel to a 200a electrical panel. bringing electrical up to code · 149 m away
- 11105 Eastview CirJan 9, 2025New construction of single family dwelling · 160 m away
- 11106 Eastview CirJun 2, 2026New - sfd plumbing rough plumbing top out plumbing final - fixtures installation gas services to home · 164 m away
- 10909 Hillcrest RdAug 4, 20261. excavate trench to depth of 20” minimum and install new poly gas line with tracer wire and new flex risers. 2. penetrate exterior brick wall and install new black iron gas pipe to connect to existing gas line inside of building. 3. pressure test entire gas system and obtain green tag from city inspector · 170 m away