Recent · latest filing Mar 2026Residential
7005 Helsem Way
Dallas, TX 75230
Water heater replacement permitted at 7005 Helsem Way
A residential plumbing permit indicates one 50-gallon water heater is being replaced at 7005 Helsem Way. The City of Dallas permit was filed on March 30, 2026, under permit RES-PLM-26-003348.
Summarized from City of Dallas records · updated Mar 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 30, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7005 Helsem Way
What work is being done at 7005 Helsem Way?
A City of Dallas residential plumbing permit indicates replacement of one 50-gallon water heater.
When was the water heater replacement permitted?
The permit was filed on March 30, 2026.
What is the permit number for 7005 Helsem Way?
The permit number is RES-PLM-26-003348.
Is a new home being built at 7005 Helsem Way?
The listed permit is for replacing one 50-gallon water heater, not for new home construction.
What kind of permit was filed for 7005 Helsem Way?
The City of Dallas record identifies it as a residential plumbing permit filed March 30, 2026.
Also being built nearby
All of 75230- 6970 Helsem Way SOct 2, 2020Gas test · 53 m away
- 7054 Helsem Way SDec 15, 2020Foundation repair · 107 m away
- 6987 Helsem WayJul 8, 20254 ton system · 135 m away
- 6983 Helsem WayOct 16, 2025Install 50 gallon rheem water heater · 138 m away
- 12621 Breckenridge DrSep 18, 2025Foundation repair for hill crest villas condos 12621, 12623, and 12625 breckenridge dr. dalas, tx 75230 installing a total of 20 steel piers to correct the deflection of the slab · 139 m away
- 12608 Breckenridge DrMay 28, 2026Removal of existing condenser and coil and installation of new condenser and coil · 149 m away
- 12624 Breckenridge DrJun 2, 202512624 breckenridge replace rotten wood to stabilize foundation · 153 m away
- 6963 Helsem WayOct 6, 2026Repair hot water leak via 11ft exterior tunnel · 160 m away
- 7116 Helsem BendNov 9, 2026Replacing a 2 ton, 3 ton and 4 ton gas complete systems and complete duct replacement · 161 m away
- 7128 Helsem BendJan 28, 2026Electrical remodel · 171 m away
- 7136 Helsem BendDec 9, 2025Replacing sewer clean-out that has shifted and repair 2 additional leaks on sewer line · 177 m away
- 19 Ashton CtJan 23, 2026Installed 50 gal gas wh in 2nd floor pull down attic · 181 m away