7136 Blairview Dr
Dallas, TX 75230
Bathroom renovations permitted at 7136 Blairview Dr
Dallas permits indicate bathroom renovations and related interior, window, plumbing, and electrical work at this residence. The alteration permit was filed January 13, 2026, followed by plumbing and electrical permits on January 16, 2026.
Summarized from City of Dallas records · updated Jan 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 16, 2026
- since Jan 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsNsfaa jnj & bath renovation summaryjnj bath:plumbing: relocate shower drain, rough-in new water lines, thermostatic valve, shower head, handheld sprayer; replace vanity valves; rough-in for new fixtures; prep for one-piece toilet with washlet. trim-out includes shower trim, schluter drain cover, two vanity faucets, toto washlet toilet, and remote.electrical: rough-in led recessed lights (3-head in shower, two 5-head for bath and vanity), two j-boxes for pendants, wiring for led mirrors, under-cabinet lighting, outlets for washlet and vanity, exhaust fan, schluter heated floor. trim-out includes pendants, led mirrors, exhaust fan, switches/dimmers (3-way for lights and pendants), gfci, tamper-resistant outlets, and lutron glossy white plate covers.framing & masonry: remove vanity window; reframe for marvin fiberglass transom (72" x 12"), install zip-wall sheathing, re-brick to close old openings and finish transom surround.pocket doors & drywall: remove two bedroom doors; install pocket door framing, solid core doors, soft-close tracks, privacy hardware; relocate first bedroom door by 6". install sheetrock in bath and affected bedroom walls; tape and bed.primary bath:plumbing: resize shower for tub space; recenter drain, relocate supply lines and valve to pony wall; rough-in thermostatic valve, shower head, handheld sprayer; schluter kerdi membrane for shower pan. install bane ultra thermal air tub; rough-in drain and water lines for tub filler; keep double vanity, replace stops and p-traps; relocate toilet. trim-out includes shower trim, tub with motor/blower, wall-mounted tub filler, vanity faucet, toto neorest ls toilet with washlet, and remote.electrical: dedicated 30a line for tub motor; led recessed lights (shower, tub, vanity, main area); outlets for toilet, vanity, linen cabinet; wiring for medicine cabinet, exhaust fan with heater, toe-kick led lighting; schluter heated floor; relocate tv outlet. trim-out includes lutron plate covers, undercabinet lighting, led medicine cabinet, exhaust fan, switches/dimmers, gfci, tamper-resistant outlets.window framing & masonry: remove 24" x 36" window; reframe for marvin transom (48" x 14" at 66" height); install zip-wall sheathing; re-brick to close old openings and match finish.primary bath renovation summaryplumbing: shower remains but is reduced in size for tub space; drain recentered, zero threshold, water lines and valve relocated to pony wall. install thermostatic valve, shower head, handheld sprayer, and schluter kerdi membrane on floor/walls. tub: bane ultra thermal air tub with lh drain; add hot/cold lines to pony wall for wall-mounted filler and handheld. vanity: keep double sinks; replace stops, p-traps, raise supply lines. toilet: move to left side; rough-in flange, p-trap, valve. trim-out: install shower trim, head, sprayer, schluter drain cover, tub with motor/blower, tub filler, vanity faucet, neorest ls toilet with washlet and remote.electrical: dedicated 30a line for tub motor. install lightheaded minimalist led recessed lights: 3-head in shower, 3-head above tub, 2×1-head above vanity, 2×5-head in main area. add outlet for neorest toilet, relocate switches/dimmers above toilet, wire medicine cabinet/led mirror, 2 outlets in vanity backsplash (1 gfci), 1 outlet in linen cabinet. rough-in exhaust fan with heater, toe-kick led lighting (motion-activated), power for schluter ditra heated floor. bedroom: move tv outlet 2 ft. trim-out: lutron glossy white plate covers, undercabinet lighting, recessed led medicine cabinet, exhaust fan, new switches/dimmers/outlets (gfci, tr outlets), replace all with lutron glossy white.window framing: remove 24"×36" window; reframe for marvin fiberglass transom (48"×14") at 66" aff. exterior: reframe wall, install zip-wall sheathing/tape, marvin essential fiberglass window (stone white interior/exterior).masonry: re-brick former window opening to match existing brick/mortar as closely as possible
Nsfaa jnj & bath renovation summaryjnj bath:plumbing: relocate shower drain, rough-in new water lines, thermostatic valve, shower head, handheld sprayer; replace vanity valves; rough-in for new fixtures; prep for one-piece toilet with washlet. trim-out includes shower trim, schluter drain cover, two vanity faucets, toto washlet toilet, and remote.electrical: rough-in led recessed lights (3-head in shower, two 5-head for bath and vanity), two j-boxes for pendants, wiring for led mirrors, under-cabinet lighting, outlets for washlet and vanity, exhaust fan, schluter heated floor. trim-out includes pendants, led mirrors, exhaust fan, switches/dimmers (3-way for lights and pendants), gfci, tamper-resistant outlets, and lutron glossy white plate covers.framing & masonry: remove vanity window; reframe for marvin fiberglass transom (72" x 12"), install zip-wall sheathing, re-brick to close old openings and finish transom surround.pocket doors & drywall: remove two bedroom doors; install pocket door framing, solid core doors, soft-close tracks, privacy hardware; relocate first bedroom door by 6". install sheetrock in bath and affected bedroom walls; tape and bed.primary bath:plumbing: resize shower for tub space; recenter drain, relocate supply lines and valve to pony wall; rough-in thermostatic valve, shower head, handheld sprayer; schluter kerdi membrane for shower pan. install bane ultra thermal air tub; rough-in drain and water lines for tub filler; keep double vanity, replace stops and p-traps; relocate toilet. trim-out includes shower trim, tub with motor/blower, wall-mounted tub filler, vanity faucet, toto neorest ls toilet with washlet, and remote.electrical: dedicated 30a line for tub motor; led recessed lights (shower, tub, vanity, main area); outlets for toilet, vanity, linen cabinet; wiring for medicine cabinet, exhaust fan with heater, toe-kick led lighting; schluter heated floor; relocate tv outlet. trim-out includes lutron plate covers, undercabinet lighting, led medicine cabinet, exhaust fan, switches/dimmers, gfci, tamper-resistant outlets.window framing & masonry: remove 24" x 36" window; reframe for marvin transom (48" x 14" at 66" height); install zip-wall sheathing; re-brick to close old openings and match finish.primary bath renovation summaryplumbing: shower remains but is reduced in size for tub space; drain recentered, zero threshold, water lines and valve relocated to pony wall. install thermostatic valve, shower head, handheld sprayer, and schluter kerdi membrane on floor/walls. tub: bane ultra thermal air tub with lh drain; add hot/cold lines to pony wall for wall-mounted filler and handheld. vanity: keep double sinks; replace stops, p-traps, raise supply lines. toilet: move to left side; rough-in flange, p-trap, valve. trim-out: install shower trim, head, sprayer, schluter drain cover, tub with motor/blower, tub filler, vanity faucet, neorest ls toilet with washlet and remote.electrical: dedicated 30a line for tub motor. install lightheaded minimalist led recessed lights: 3-head in shower, 3-head above tub, 2×1-head above vanity, 2×5-head in main area. add outlet for neorest toilet, relocate switches/dimmers above toilet, wire medicine cabinet/led mirror, 2 outlets in vanity backsplash (1 gfci), 1 outlet in linen cabinet. rough-in exhaust fan with heater, toe-kick led lighting (motion-activated), power for schluter ditra heated floor. bedroom: move tv outlet 2 ft. trim-out: lutron glossy white plate covers, undercabinet lighting, recessed led medicine cabinet, exhaust fan, new switches/dimmers/outlets (gfci, tr outlets), replace all with lutron glossy white.window framing: remove 24"×36" window; reframe for marvin fiberglass transom (48"×14") at 66" aff. exterior: reframe wall, install zip-wall sheathing/tape, marvin essential fiberglass window (stone white interior/exterior).masonry: re-brick former window opening to match existing brick/mortar as closely as possible
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 7136 Blairview Dr
What is being built at 7136 Blairview Dr?
The permits describe renovations to bathrooms, along with related plumbing, electrical, window, and interior work. They do not describe a new building.
When were the permits filed for 7136 Blairview Dr?
The City of Dallas alteration permit, RES-ALT-ADD-26-000047, was filed January 13, 2026. Plumbing permit RES-PLM-26-000624 and electrical permit RES-ELC-26-000324 were filed January 16, 2026.
Is 7136 Blairview Dr getting a bathroom remodel?
Yes. The alteration permit describes bathroom work including changes to showers, a tub, plumbing fixtures, lighting, ventilation, and heated flooring.
What electrical work is permitted at 7136 Blairview Dr?
Permit RES-ELC-26-000324, filed January 16, 2026, is described as “An addition.” The alteration permit also lists electrical work for bathroom lighting, outlets, ventilation, and heated floors.
Are there window or bedroom changes in the 7136 Blairview Dr permit?
The alteration permit describes replacing windows with transom windows, closing former window openings with brick, installing pocket doors, and making related drywall and framing changes.
Also being built nearby
All of 75230- 7129 Blairview DrFeb 28, 2026Install 40 gallon slim gas water heater in garage closet · 22 m away
- 7116 Blairview DrMar 27, 2026We will be bringing our fence forward closer to, but still well short of, the build line of our home. if you are looking at our home from the street, the right side of the fence will extend approximately 265 inches (22 feet). the right side will also have a gate. the left side will move forward 320 inches, or 26.5 feet. the fence will remain 8 feet tall throughout. after the fence is moved, both sides of it will still be well short of the required 25-foot setback · 43 m away
- 7107 Blairview DrAug 19, 2026Electrical addition for theater room lights plugs switches · 67 m away
- 7129 Aberdeen AveOct 5, 2026Electrical being ran for a generator · 87 m away
- 7115 Aberdeen AveMar 25, 2025Install of natural gas circ tankless install turn key up to 4.5 bath · 88 m away
- 7107 Aberdeen AveNov 24, 2025Gas test/generator · 96 m away
- 7124 Mimosa LnJul 23, 2026Leaking t a branch line in attic · 102 m away
- 7136 Aberdeen AveJan 23, 2026Replace 5 ton gas furnace only · 103 m away
- 7142 Mimosa LnJul 8, 2026Pad & block support 2 tunnel access 1replace crawl space drop beam repair (sits below joists) 8.81 ft reset & reshim 1,143.93 sq ft · 104 m away
- 7144 Aberdeen AveOct 12, 2026This is to install new sewer from clean outs to city top · 104 m away
- 7112 Mimosa LnOct 16, 2025Saw cut/haul-off existing two approaches only (keep city sidewalk, if row allows it)• saw cut and remove existing sidewalk only at two existing approaches if row request.• replaced city sidewalk if row requires it, only at existing approaches.• 56’lf x 2’6” x 6” new concrete curb and gutter reinforced per city codes · 110 m away
- 7106 Mimosa LnFeb 19, 2026Crawlspace drain repair repair 5 foot section of piping and install new pvc drain line · 116 m away