7303 Hill Forest Dr
Dallas, TX 75230
Home remodel and 396-square-foot addition on Hill Forest Dr
A residential interior and exterior remodel with a 396-square-foot addition was permitted at 7303 Hill Forest Dr on July 8, 2026. City of Dallas plumbing and electrical permits followed on August 18 and August 25, 2026.
Summarized from City of Dallas records · updated Aug 25, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 25, 2026
- since Jul 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projects1. demolition water to master bath below slab or in wall, for new 1" pex supply overhead from attic wh.2. video scope and locate main sewer line below new toilet location. demolition slab and relocate toilet per plan.3. plumb drain & vent for new master sink locations, tub, and shower per plan. add venting through roof as needed.*new exterior sink and shower drain will require exterior beam demolition into new slab addition.4. install pex supply from attic hot & cold to new master bath fixture locations and install new hose bib at rear left.5. install single valve and head at shower and wall mount valve at master tub. supply to tub from sink cabinet per code.6. relocate 2nd floor shower drain to end for new gc supplied tub install and valve replacement.7. replace copper water stub outs at kitchen and upstairs bathroom. install air hammer arrestors pre code.8. install new tile shower drain and rubber tile liner with test in master shower. seat installed above liner by gc.9. relocate island kitchen sink drain and water above slab and inside of new toekick. demolition slab only to lower drain.10. tap existing gas supply in attic with isolation valve and install new csst gas supply to family room fireplace & test.11. adjust gas at kitchen range as needed per new appliance specs, provided by gc.12. remove attic tank wh and install navien tankless unit with circulation, drip pan with flood stop, and dual pvc vents.*gc to provide roof flashing and termination fitting install at time of wh install.13. install 1/2" pvc condensation piping to new master sink location.14. test all new drain, water, and gas piping for city inspection. remove tests after city approval.15. excavate water main in ground behind kitchen sink area, tap water main, and install water loop and drain from water and sewer mains to corner of garage/kitchen wall.*gc to provide 4-way electrical outlet at filter location
1. demolition water to master bath below slab or in wall, for new 1" pex supply overhead from attic wh.2. video scope and locate main sewer line below new toilet location. demolition slab and relocate toilet per plan.3. plumb drain & vent for new master sink locations, tub, and shower per plan. add venting through roof as needed.*new exterior sink and shower drain will require exterior beam demolition into new slab addition.4. install pex supply from attic hot & cold to new master bath fixture locations and install new hose bib at rear left.5. install single valve and head at shower and wall mount valve at master tub. supply to tub from sink cabinet per code.6. relocate 2nd floor shower drain to end for new gc supplied tub install and valve replacement.7. replace copper water stub outs at kitchen and upstairs bathroom. install air hammer arrestors pre code.8. install new tile shower drain and rubber tile liner with test in master shower. seat installed above liner by gc.9. relocate island kitchen sink drain and water above slab and inside of new toekick. demolition slab only to lower drain.10. tap existing gas supply in attic with isolation valve and install new csst gas supply to family room fireplace & test.11. adjust gas at kitchen range as needed per new appliance specs, provided by gc.12. remove attic tank wh and install navien tankless unit with circulation, drip pan with flood stop, and dual pvc vents.*gc to provide roof flashing and termination fitting install at time of wh install.13. install 1/2" pvc condensation piping to new master sink location.14. test all new drain, water, and gas piping for city inspection. remove tests after city approval.15. excavate water main in ground behind kitchen sink area, tap water main, and install water loop and drain from water and sewer mains to corner of garage/kitchen wall.*gc to provide 4-way electrical outlet at filter location
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 7303 Hill Forest Dr
What is being built at 7303 Hill Forest Dr?
City of Dallas records describe an interior and exterior home remodel with a 396-square-foot addition. The records also include plumbing and electrical work.
When was the remodel at 7303 Hill Forest Dr permitted?
The residential alteration and addition permit was filed July 8, 2026. Plumbing and electrical permits were filed August 18 and August 25, 2026.
How large is the addition at 7303 Hill Forest Dr?
The City of Dallas permit describes a 396-square-foot addition.
What plumbing work is planned at 7303 Hill Forest Dr?
The August 18, 2026 plumbing permit describes work including bathroom and kitchen plumbing changes, a tankless water heater, and related supply and drain work. The permit number is RES-PLM-26-008710.
What is being remodeled near Swan Lake Amenity Center?
A home at 7303 Hill Forest Dr, about 183 meters from Swan Lake Amenity Center, is undergoing an interior and exterior remodel with a 396-square-foot addition, according to a July 8, 2026 City of Dallas permit.
Also being built nearby
All of 75230- 7319 Hill Forest DrMay 20, 2025Replace existing hvac system · 11 m away
- 12370 Swan Lake PkwyNov 10, 2026Nsfaa proposed new single family construction · 23 m away
- 12246 Swan Lake PkwyNov 6, 2026Installing electric for new construction · 23 m away
- 12387 Swan Lake PkwyNov 16, 20264-ton gas complete system replacement · 23 m away
- 12379 Swan Lake PkwyNov 16, 20264-ton gas complete system replacement · 23 m away
- 12367 Swan Lake PkwyOct 23, 2026Nsfaa-proposed new single family construction · 23 m away
- 12234 Swan Lake PkwyNov 9, 2026Installing electric for new construction · 23 m away
- 12242 Swan Lake PkwyNov 9, 2026Installing electric for new construction · 23 m away
- 12375 Swan Lake PkwyNov 16, 20264.0-ton gas complete system replacement · 23 m away
- 12371 Swan Lake PkwyNov 16, 20263.5 ton gas complete system replacement · 23 m away
- 12374 Swan Lake PkwyNov 16, 2026Nsfaa proposed new single family construction · 23 m away
- 7347 Hill Forest DrNov 16, 2020Install water heater · 24 m away