10100 N Central Expy
Dallas, TX 75231
Interior alterations permitted at 10100 N Central Expressway
City of Dallas permits filed April 29 and June 24, 2026, describe interior alterations at 10100 N Central Expressway. The work includes a new demising wall in Suite 100 and about 120 linear feet of new non-load-bearing walls, along with electrical outlets, wall finishing and carpet patching.
Summarized from City of Dallas records · updated Jun 24, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 24, 2026
- since Nov 30, 2020
- Largest scope
- —
- Listed value
- $630
- partial · often understated
Permit & project history
6 projectsMcr we are building approximately 120 lf of new walls, adding electrical outlets, tape bedding & paint new walls only. we are patching carpet. fire alarm devices and sprinklers will not be moved. fire exit signs will not be moved.all work subject to field inspector approvalnon-load bearing walls only
Mcr we are building approximately 120 lf of new walls, adding electrical outlets, tape bedding & paint new walls only. we are patching carpet. fire alarm devices and sprinklers will not be moved. fire exit signs will not be moved.all work subject to field inspector approvalnon-load bearing walls only
City of Dallas permitCommercial Alteration Addition Permit-all work subject to field inspector approval a demising wall will be constructed in suite 100, currently 4459 square feet. suite 100 will be reduced to 3782 square feet. the remaining 677 square will default to suite 110 and become available for lease
-all work subject to field inspector approval a demising wall will be constructed in suite 100, currently 4459 square feet. suite 100 will be reduced to 3782 square feet. the remaining 677 square will default to suite 110 and become available for lease
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 10100 N Central Expy
What is being built at 10100 N Central Expy in Dallas?
Two City of Dallas permits describe interior alterations, including a demising wall in Suite 100 and about 120 linear feet of new non-load-bearing walls.
When were permits filed for work at 10100 N Central Expy?
The permits were filed April 29, 2026 (COM-ALT-ADD-26-000739) and June 24, 2026 (COM-ALT-ADD-26-001364).
What changes are planned for Suite 100 at 10100 N Central Expressway?
The April 29 permit says a demising wall will reduce Suite 100 from 4,459 to 3,782 square feet, with the remaining 677 square feet assigned to Suite 110 and available for lease.
What interior work is included in the June 2026 permit?
The June 24 permit describes about 120 linear feet of new walls, electrical outlets, wall taping and painting, and carpet patching. It says fire alarm devices, sprinklers and exit signs will not be moved.
What work is planned near Cooper Construction Downsize on North Central Expressway?
At 10100 N Central Expy, about 91 meters from the listed Cooper Construction Downsize landmark, Dallas permits describe interior alterations. The records do not identify a tenant for the address.
Also being built nearby
All of 75231- 10100 N Central ExpyJun 29, 2026Installation of new receptacles and switches as shown on plans. re-work switching of existing light fixtures so that lighting is separated between the two lease spaces
- 5421 La Sierra DrJun 8, 2026Elecetrical service release, no work · 81 m away
- 10000 N Central Expressway · Charter 10000 Ncx Owner LLCApr 11, 2025Champion commercial insurance agency, llc — renovation/alteration — interior renovation of existing lobby space in high rise building · 91 m away
- 10000 N Central Expressway · Charter 10000 Ncx Owner LLCFeb 14, 2025Spec suite 650 — renovation/alteration — interior renovation of existing office space in high rise building · 91 m away
- 10000 N Central Expressway · Charter 10000 Ncx HoldingsJan 17, 2025Musgrove law expansion — renovation/alteration — interior renovation of existing office space in high rise building · 91 m away
- 10000 North Central Expressway · Charter 10000 Ncx Owner, LLCAug 7, 2026Cooper construction downsize — renovation/alteration — interior renovation of existing office space in high rise building · 91 m away
- 10000 North Central Expressway · Charter 10000 Ncx Owner, LLCAug 23, 2024Titan bank — renovation/alteration — renovation of approximately 13,500 sq ft of existing interior office space in an existing, fully-sprinklered building · 91 m away
- 10000 N Central ExpyNov 10, 2026Furnish & install 2- supply air diffusers 2- return air grilles · 91 m away
- 10210 N Central ExpyMar 5, 2026Mcr demolition of one wall 4'8" long to ceiliing, construction of one temporary wall for future expansion 5'4" long to ceiling · 103 m away
- 5400 Glen Lakes DrDec 29, 2020Tc-2020-26405 12/12/2020 · 104 m away
- 10260 N Central ExpyMay 14, 2026Install lav sink and washer box · 164 m away
- 5442 La Sierra DrJul 22, 2025Relocate gas meter on behalf of atmos · 172 m away