7.83-kW rooftop solar system planned at Wakefield St home
City of Dallas records indicate installation of a 7.83-kW roof-mounted solar PV system at 7066 Wakefield St. The solar and electrical permits were filed on February 5, 2026.
Summarized from City of Dallas records · updated Feb 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 5, 2026
- since Feb 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7066 Wakefield St
What is being installed at 7066 Wakefield St?
City of Dallas permit records indicate a 7.83-kW roof-mounted solar PV system at the residential address.
How large is the solar system planned for 7066 Wakefield St?
The permit descriptions specify a 7.83-kW roof-mounted photovoltaic system.
When were permits filed for the solar installation at 7066 Wakefield St?
Both City of Dallas permits are dated February 5, 2026.
What are the permit numbers for the Wakefield St solar project?
The records list solar permit RES-SOLAR-25-000648 and electrical permit RES-ELC-26-000680, both dated February 5, 2026.
Are there separate solar and electrical permits for 7066 Wakefield St?
Yes. City of Dallas records list a Residential Solar/PV Permit and a Residential Electrical Permit for the 7.83-kW rooftop system.
Also being built nearby
All of 75231- 7054 Wakefield StNov 6, 2020Replace or modify existing hvac · 24 m away
- 7061 Wakefield CirJan 6, 2026Gas test · 46 m away
- 7053 Wakefield CirFeb 20, 2026Wooden fence install- this is for installing a 182 feet long x 8 feet tall wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim- includes 2x6x12 treated kick board along the base of the fence- includes installing 1 gate that are 42" wide.sliding e-gate furnish and install complete sliding e-gate system• liftmaster sliding gate operator (solar-compatible)• solar panel power kit with mounting hardware• heavy-duty v-track installation• reinforced concrete footer for operator, posts, and track• custom metal backing frame fabrication and installation• 4x4 steel post set in concrete• rubber rollers for smooth gate travel• all required brackets, hardware, and accessories• professional labor for full assembly, alignment, and testingadditional wooden fence install- includes demoing and hauling off existing fence that is 32' long.- this quote is for installing a 47 feet long x 8 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in maximizer concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build board on board fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high.- includes installing 1 gate that are 36" wide- prestained color is dark walnutwrought iron47' of additional fence to match the fence build and e-gate already signed for, new 4' tall wrought iron with one gate and new post and material · 50 m away
- 7049 Wakefield CirDec 18, 2020Addition to sfd · 51 m away
- 7042 Wakefield StJul 15, 2026Residential reroofremove current shingle layerreplace with new shingle layer · 68 m away
- 6990 Walling LnSep 13, 2026Gas test atmos release · 84 m away
- 6976 Walling LnJun 4, 2026Water heater replacement · 97 m away
- 6945 Walling LnOct 15, 2026Hvac replacement4 ton gas complete system horizontal carrier 26tpa · 105 m away
- 7031 Wakefield StJul 8, 2026Replacing 4 ton gas complete system · 114 m away
- 7053 Freemont StFeb 13, 2025Residential addition/remodel · 116 m away
- 6964 Walling LnNov 9, 2026Installing 3 total piers · 119 m away
- 6958 Walling LnMar 10, 2026Install 21 total pilings, 1850 sq ft reset/reshim · 133 m away