7150 Greenville Ave
Dallas, TX 75231
New roof assembly permitted at 7150 Greenville Ave
A new roof assembly is planned for the commercial property at 7150 Greenville Ave. A City of Dallas commercial roofing permit dated November 6, 2025, describes removing the existing roof and installing a new assembly to the structural concrete deck.
Summarized from City of Dallas records · updated Nov 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2025
- since Nov 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7150 Greenville Ave
What is happening at 7150 Greenville Ave?
A City of Dallas permit describes removing the existing roof and installing a new roof assembly to the structural concrete deck. The permit, COM-ROOF-25-000167, was filed November 6, 2025.
Is a new building being constructed at 7150 Greenville Ave?
The available permit is for commercial roofing work, not construction of a new building. It describes replacing the existing roof assembly.
What is being built near Taco Bell on Greenville Avenue?
At 7150 Greenville Ave, about 212 meters from Taco Bell at 7110 Greenville Ave, a City of Dallas permit describes roof replacement. The permit was filed November 6, 2025.
What does permit COM-ROOF-25-000167 cover?
The permit covers tearing off the existing roof and installing a new roof assembly to the structural concrete deck at 7150 Greenville Ave. It is a City of Dallas commercial roofing permit dated November 6, 2025.
When was the roof work at 7150 Greenville Ave permitted?
The City of Dallas permit was filed November 6, 2025. The record does not provide a construction schedule.
Also being built nearby
All of 75231- 7115 Greenville Ave · Texas Institute For SurgeryDec 13, 20242nd q team - texas institute for surgery at texas health presbyterian dallas - commercial interior remodel of existing surgery / physician's office · 98 m away
- 7038 Greenville Ave · Rocky Meadow LLCAug 28, 2025Plumbing for mens womens bathrooms remodel · 118 m away
- 7035 Greenville Ave · Ignite Capital LLCJul 30, 2026Replace 10 ton package unit and duct work · 157 m away
- 7118 Greenville AveFeb 14, 2026Gas line and test · 169 m away
- 7031 Holly Hill DrJan 22, 2021Service release no work · 175 m away
- 7009 Holly Hill Dr · Holly Hill Shopping ComplexApr 26, 2025Holly hill shopping trip — new construction — build a new building 4,760 sq ft to be a shopping strip with 5 suites · 182 m away
- 7009 Holly Hill DrMar 27, 2026Standard review: build a structure with 4,760 sq ft the shopping strip will have 4 suites. the construction will be steel frame with metal stud framing interior. the exterior finish will be stucco, stone and glass store front · 182 m away
- 7107 Holly Hill DrJul 3, 2026Hvac system (changeout/alteration) · 195 m away
- 7110 Greenville Ave · North Texas Bells Inc.Jul 20, 2026Replace all existing light fixtures with new (kitchen lights will remain)validating on existing permit: com-alt-add-26-000623 · 212 m away
- 7007 Greenville AveNov 4, 2025Emergency repairs on service due to car hitting pole · 247 m away
- 7071 Twin Hills AveOct 16, 2026Alteration permit to officially combine former suites 7071 twin hills ave and 7071 twin hills ave suite a into 7071 twin hills ave. no structural modifications · 255 m away
- 7000 Holly Hill DrJan 21, 2026Dsst-disd tasby phased renovation of existing school adding a marquee sign and secure vestibule to the school · 260 m away