7459 Walling Ln
Dallas, TX 75231
Gas leak repair and testing permitted at 7459 Walling Ln
A residential plumbing permit at 7459 Walling Ln covers gas leak repair and a gas test. The City of Dallas permit was filed May 8, 2026, under permit RES-PLM-26-004850.
Summarized from City of Dallas records · updated May 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7459 Walling Ln
What is happening at 7459 Walling Ln?
A City of Dallas residential plumbing permit covers gas leak repair and a gas test. It was filed May 8, 2026, as permit RES-PLM-26-004850.
Is a new home being built at 7459 Walling Ln?
The permit record describes gas leak repair and gas testing, not new home construction.
What does permit RES-PLM-26-004850 cover?
It covers repair of a gas leak and a gas test at 7459 Walling Ln. The permit was filed May 8, 2026.
When was the gas repair permitted at 7459 Walling Ln?
The City of Dallas permit was filed May 8, 2026.
Is the work at 7459 Walling Ln a plumbing project?
Yes. The City of Dallas categorized the record as a residential plumbing permit for gas leak repair and testing.
Also being built nearby
All of 75231- 7454 Walling LnJun 9, 2025Reroof asfault compostion shingles · 20 m away
- 7447 Walling LnNov 7, 2025Gas test-atmos shut off meter · 47 m away
- 7471 Walling LnMay 14, 2025The house is a duplex (7471/7473) and the previous owner supplied both sides from the 7471 meter, letting the 7473 meter lie unused. this application is for reconnecting the 7473 supply line to the 7473 meter. there is a branch off of the 7471 supply that will be removed so that both sides are fed straight from their meters · 47 m away
- 7473 Walling LnMay 15, 2025The house is a duplex (7471/7473) and the previous owner supplied both sides from the 7471 meter, letting the 7473 meter lie unused. this application is for reconnecting the 7473 supply line to the 7473 meter. there is a branch off of the 7471 supply that will be removed so that both sides are fed straight from their meters · 55 m away
- 7236 Edgerton DrSep 29, 2020Install swimming pool · 86 m away
- 7224 Edgerton DrAug 15, 2025Sewer relay and tunnel under slab and replace cast iron with schedule 40 pvc · 88 m away
- 7436 Walling LnJun 17, 2026Install 40 gal gas water heater · 88 m away
- 7218 Edgerton DrMay 14, 2025Mechanical / addition hvac install · 91 m away
- 7223 Edgerton DrOct 5, 2020Electrical remodel · 101 m away
- 7485 Walling LnNov 12, 2025Replace 3 ton complete · 103 m away
- 7494 Walling LnNov 4, 2025Atmos shut down meter · 139 m away
- 7417 Walling LnSep 30, 2025Gas test · 166 m away