7502 Greenville Ave
Dallas, TX 75231 · Walnut Hills-Greenville Ave, LLC
Dallas Rehab third-floor remodel includes 18 patient rooms
A third-floor renovation at Dallas Rehab includes work on 18 patient rooms, a nurse station, walls and doors, and a kitchen. The project was registered with TDLR on December 5, 2025; Dallas permits filed in 2026 also cover kitchen plumbing, electrical work and interior changes.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 6, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Aug 6, 2026
- since Dec 5, 2025
- Largest scope
- 16,500 sf
- Estimated cost
- $195K
- state registration
Permit & project history
7 projectsQteam minor interior renovation to existing kitchen and adjacent service line area. work includes removal of a small non-load-bearing partition, limited extension of an interior wall (~5 feet) for equipment layout, and installation of additional sinks and electrical receptacles. plumbing work consists of connecting new fixtures, including a three-compartment sink, to existing nearby systems. all work is within an existing conditioned space with no structural modifications, no change to occupancy, and no change to building footprint
Qteam minor interior renovation to existing kitchen and adjacent service line area. work includes removal of a small non-load-bearing partition, limited extension of an interior wall (~5 feet) for equipment layout, and installation of additional sinks and electrical receptacles. plumbing work consists of connecting new fixtures, including a three-compartment sink, to existing nearby systems. all work is within an existing conditioned space with no structural modifications, no change to occupancy, and no change to building footprint
City of Dallas permitCommercial Alteration Addition PermitQteam qr ada reset for tdlr compliance, updating all patient-side sinks, opening/revising walls for recessed plumbing, relocating emergency phones per new layout, and completing flooring prep in gym/dining areas
Qteam qr ada reset for tdlr compliance, updating all patient-side sinks, opening/revising walls for recessed plumbing, relocating emergency phones per new layout, and completing flooring prep in gym/dining areas
City of Dallas permitCommercial Alteration Addition PermitAda remodel of 18 patient rooms, demolition of a nurse station, new walls and doors, and new demolition kitchen sq ft 16500 — advance dallas hospital and clinincs
TDLR project registrationRenovation/AlterationInspection Complete16,500 sq ft$195K est.- Project #
- TABS2026007344
- Tenant / owner
- Dallas Rehab 3rd Floor Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 7502 Greenville Ave
What is being built at 7502 Greenville Ave?
Records describe a renovation of the third floor at Dallas Rehab, not a new building. The TDLR registration lists 18 patient rooms, a nurse station, new walls and doors, and kitchen work.
What work is included in the Dallas Rehab third-floor remodel?
The December 5, 2025 TDLR registration describes remodeling 18 patient rooms, demolishing a nurse station, and adding walls and doors. It lists the project area as 16,500 square feet.
Is the kitchen at 7502 Greenville Ave being remodeled?
Permits indicate interior kitchen and service-line work, including additional sinks and electrical receptacles. Dallas also filed kitchen plumbing and electrical permits on August 6, 2026.
When were permits filed for the Dallas Rehab remodel?
The TDLR project registration was dated December 5, 2025. The latest records provided are kitchen electrical and plumbing permits filed August 6, 2026.
How much is the Dallas Rehab third-floor remodel estimated to cost?
The TDLR registration lists an applicant-estimated project cost of $195,000. This is an estimate, not a confirmed final cost.
Also being built nearby
All of 75231- 7515 Greenville AveMar 3, 2026Mcr repaint walls and new flooring · 113 m away
- 7557 Greenville AveJan 20, 2021Commercial finish out · 127 m away
- 8328 Walnut Hill LnDec 17, 2020Permanent electrical service · 236 m away
- 8355 Walnut Hill LnMay 21, 2025Remove existing backflow prevention device, reduced pressure zone. located in the closet inside suite 100 and replace with a new rpz backflow prevention device. ***please ensure to add required fees for backflow · 255 m away
- 8383 Meadow RdSep 19, 2025Install backflow at kitchen ice machine · 260 m away
- 7403 Greenville AveDec 17, 2020Permanent electrical service · 261 m away
- 7606 Greenville AveJan 19, 2021Install lawn sprinkler · 273 m away
- 8345 Walnut Hill LnApr 9, 2026All electrical interior remodel, and equipment installation · 283 m away
- 8290 Walnut Hill LnNov 4, 2026Install an ike kiosk for public use · 286 m away
- 8335 Walnut Hill LnOct 7, 2025Replace 1/2" rpz device in utility room · 311 m away
- 8350 Meadow RdOct 19, 2026Scan concrete deck to locate any cables or conduit at sink locationcore hole for sink waste at new locationget into occupied space below, run 2" copper drain from sink location, and connect to closest waste line.run copper line overhead to serve sink and ice machineset sink, faucet, ice machine, and provide and install point of use water heater.note: ice machine drain to be pumped to sink drain. pump furnished by others · 361 m away
- 8350 Meadow Road · Trinity Interests, Inc.Jul 27, 2026Merritt design group — renovation/alteration — interior renovation · 361 m away
More demolitions in 75231, gyms & fitness in 75231, restaurants in 75231.